View Single Post
  #6   Report Post  
Posted to alt.home.repair
DanG
 
Posts: n/a
Default misaligned concrete expansion joints

It certainly won't be a perfect solution, but you might have them
cut both construction joint lines on through. This will give you
two joints about a foot apart. If done well and caulked I think
everyone can accept the result.
______________________________
Keep the whole world singing . . . .
DanG (remove the sevens)




"mfreak" wrote in message
oups.com...
I am having a driveway poured, and the expansion joints don't
line up.
The joint lines up with the garage floor joint on the top, then
it jogs

a few inches to the right towards the street. Is there any
reason you
wouldn't match the lines? Is that normal? I don't remember
ever
seeing this before.

http://www.mpw.net/doug/dw.jpg