I am having a driveway poured, and the expansion joints don't line up.
The joint lines up with the garage floor joint on the top, then it jogs
a few inches to the right towards the street. Is there any reason you
wouldn't match the lines? Is that normal? I don't remember ever
seeing this before.
http://www.mpw.net/doug/dw.jpg