View Single Post
  #12   Report Post  
Posted to rec.woodworking
Adam Jawer
 
Posts: n/a
Default New Yankee Workshop Deluxe Router Station

I ordered the plans and they sat in my shop for 4 months before I attempted
to build it. So far, I've finished the top and the fence and have been
clamping this to my table saw and supporting the front edge with roller
stands. This has sufficed for most of the stuff I'm doing and I'm in no
hurry to build the rest of the case because the table is so gosh-darn huge
and my garage is running out of square feet. I'm thinking that I'll try to
make the top attachment modular so I can put other dedicated tops for
different tools (my mortiser & planer come to mind first). I also don't
have 7 drawers worth of router bits that I need to store so I might reduce
the sice of the cabinet to trim these little drawers out and allows a
smaller base footprint to save a little extra floorspace.

-A