View Single Post
  #9   Report Post  
Dave Plowman
 
Posts: n/a
Default Central heating wiring

In article ,
Andrew Gabriel wrote:
IME, it's usually done with a couple of runs of twin or triple and
earth. I needed 7 core for mine, and after a long hunt, I found a
small electronics shop in Luton which sold 7 core suitable for
mains use (H05RR-F7, IIRC) by the metre. Recently went back to get
some more and they've closed down - bugger.


Assuming it's carrying mains, what do the regs say about treating flex as
permanent wiring in terms of long runs within a house?

--
*Money isn't everything, but it sure keeps the kids in touch.

Dave Plowman London SW 12
RIP Acorn