View Single Post
  #9   Report Post  
Posted to alt.home.repair
Zzyzx
 
Posts: n/a
Default Concrete Slab Cost

They demolition the slab then built a new one from scratch. The ruble from
the other one still needs to be hauled away. It's a post tension slab


"Edwin Pawlowski" wrote in message
newsfTzf.4328$SD3.4143@trndny07...

"Zzyzx" wrote in message
news

Yes, it had forming and a pumper. It had 6 piers poured as well

Just a rough ballpark cost


Material has to be around $30,000 +++ if it was solid concrete. I can't
imagine the cost of taking it out and hauling it away, unless it was a
matter of moving a short distance and using hte old material as filler for
the new.