View Single Post
  #8   Report Post  
Posted to alt.home.repair
Edwin Pawlowski
 
Posts: n/a
Default Concrete Slab Cost


"Zzyzx" wrote in message
news

Yes, it had forming and a pumper. It had 6 piers poured as well

Just a rough ballpark cost


Material has to be around $30,000 +++ if it was solid concrete. I can't
imagine the cost of taking it out and hauling it away, unless it was a
matter of moving a short distance and using hte old material as filler for
the new.