In article ,
John Wright wrote:
When the LNER electrified the Manchester Sheffield and Wath section of
the MS&L over the Pennines the electric locos generated power under
retardation which was fed back into the catenaries for re-use. This
system was stopped when the use on that line (now closed altogether)
declined.
London Underground trains still work like this. Many buses have a flywheel
which is spun up when they brake, then used to help get it on the move
again.
--
*OK, who stopped payment on my reality check?
Dave Plowman
London SW
To e-mail, change noise into sound.