View Single Post
  #27   Report Post  
Posted to uk.d-i-y
.
 
Posts: n/a
Default New Boiler = Room Stat = Part 'P' & Part 'L' question (long)

Hugo Nebula wrote:
On Tue, 03 Jan 2006 15:24:21 GMT, a particular chimpanzee named "."
[email protected] randomly hit the keyboard and produced:

thanks for your continuing input, how about the cable run in
relation to the regs ?


In relation to Part P; strictly speaking, any electrical work in the
kitchen is controlled. However, if your installer is CORGI
registered, he is exempt from giving notice provided the installation
is, "as a necessary adjunct to or arising out of other work being
carried out by the registered person".

WRT Part L; the installation of a central heating boiler is
controlled, but once again, if the installer is CORGI registered, he
is exempt from giving a notice. The work to replace the boiler would
include for upgrading controls.


that's just the sort of information I was seeking, thank you.

in relation to the Part P bit, would pulling a single, unbroken, cable /through/
a kitchen be classed as work /in/ the kitchen ?

thanks again.