Thread: 60A Subpanel
View Single Post
  #1   Report Post  
Posted to alt.home.repair
a12vman
 
Posts: n/a
Default 60A Subpanel

I have a 60A subpanel in my workshop that is fed from a 200A Load Center in
my Basement. The basement breaker box has 2 Single Pole 30A Breakers(Both
on the right leg, right next to each other that feed the 60A subpanel. I am
just wondering, shouldn't I be using a 60A Double pole instead of the 30A
single pole breakers? I do have a 220 Outlet in my workshop but I rarely
use it.


Thanks in Advance,
-a12vman