Default Part P notification questions

I have been in discussion with a Project Surveyor of a certain London
Borough with regards to some 'jobs' I need done around my bathroom. I
am suspicious the advice he has given is incorrect (not based on my
opinion, but articles on the web from the ODPM, NICIEC), I would
appreciate some advice.

Do I need Building Regulations approval with regards to Part P. The
Electrical work would be carried comply with BS 7671: 2001, and the
boiler has already been installed by a Corgi Registered Installer. For
each of the following jobs:

- replace an existing boiler in a Bathroom
- replace a Shaver Socket in a Bathroom
- earth bonding in a Bathroom

thanks
gna