DIYbanter

DIYbanter (https://www.diybanter.com/)
-   UK diy (https://www.diybanter.com/uk-diy/)
-   -   Keston 25 - Third Main Control Board in 22 Months (https://www.diybanter.com/uk-diy/91399-keston-25-third-main-control-board-22-months.html)

Ragworm The Abominable February 16th 05 09:30 AM

Keston 25 - Third Main Control Board in 22 Months
 
Why is it always Sunday morning?

Woke up Sunday 13th Feb, house was chilly. Had a look downstairs.
Joys. No lights, nothing on the Keston 25 boiler. Checked fuse, was
fine, buzzing from transfer as usual.

Oh good - looks like another Main Control Board required.

Called Keston 9.30am Monday, told them no lights kapputt, boiler is 22
months old. Was installed in April 2003. Had two prior calls outs,
one for a Main Control Board, one for a blocked filter, both under
warranty. "Sorry Sir, there will be a charge".

Engineer arrived at 2.40pm same day, whipped out duff card, popped new
one in, now it works.

Joys, we're now on the third Circuit board, and in just 22 months,
surely some record?

Waiting pensively for the bill (and also for this Circuit board to go
wrong).



All times are GMT +1. The time now is 10:01 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004 - 2014 DIYbanter