Hi, I've been looking on this site for an answer to my question but
seem to have found conflicting info. I've removed the gas fire in my lounge and do not intend to put another one in it's place. I plan to terminate the gas outlet and plaster it into the wall, well I plan to get someone in to do it. My main question though is regarding the chimney. I was planning to just block it off and plaster over it but..... Do I need to vent it with an air brick or similar? Are there any building regs which state that the chimney must be vented? I do not want to vent it unless I have to, as we plan to place cupboards where the fire was, are there any alternatives? There is nothing else that uses the chimney. The construction of the chimney is those breeze blocks with the mid-section removed, not sure of the technical name. There is no chimney pot or similar on the roof, it comes out of one of the ridge tiles. All advice appreciated, especially regarding any building regs. Cheers, Mark. |
#2
|
|||
|
|||
Fire removed - what next?
Browny wrote:
Hi, I've been looking on this site for an answer to my question but seem to have found conflicting info. I've removed the gas fire in my lounge and do not intend to put another one in it's place. I plan to terminate the gas outlet and plaster it into the wall, well I plan to get someone in to do it. My main question though is regarding the chimney. I was planning to just block it off and plaster over it but..... Do I need to vent it with an air brick or similar? Are there any building regs which state that the chimney must be vented? I do not want to vent it unless I have to, as we plan to place cupboards where the fire was, are there any alternatives? There is nothing else that uses the chimney. The construction of the chimney is those breeze blocks with the mid-section removed, not sure of the technical name. There is no chimney pot or similar on the roof, it comes out of one of the ridge tiles. It should be ventilated by an air brick or condensation could form in the chimney. I saw builder renovating cottage had done this. Internal Airbrick was about 18" off the floor. Now builders are not noted for doing things that aren't necessary... |
#3
|
|||
|
|||
Fire removed - what next?
|
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Mains fire detectors. Building Regs vs manufacturer's recommendations | UK diy | |||
Is it possible to use the roadside fire hydrants?? | UK diy | |||
Berry Magicoal Berryblaze gas fire | UK diy | |||
Glowworm Foundryman Gas Fire | UK diy |