Ceiling / loft insulation: What am I missing?
I'd like to insulate the bathroom. The walls will have to wait until I
re-furb the whole thing properly, but I thought the ceiling would be a good place to start. The ceiling is in three sections, following the shape of the rafters. (a slopey bit each side and a horizontal bit under the collar beam in the middle. I bet there's a name for that shape, but I can't find it.) The sloped sections should be trivial(-ish): Just PIR PB following the shape. The horizontal section has a space above and, on the (internal) end wall, a hatch gives access to the void above the corridor outside and (I thought) the space above this ceiling. Clambering up there, I find this 'internal gable' end is bricked up, though a helpful electrician has removed a couple of bricks so I can see in. A lot of the space (which is smaller than I expected but I should be able to crawl into if I had access) is filled with the debris of a historic re-roofing job, that will have to come out before insulating. So my problem is access and I could do one of the following: Cut more bricks out of the gable until I can get in. My reservation is that the bricks are presumably there for a reason, so I would have to do something fancy to maintain the structural strength. (Though it's not clear why the rafters don't do that.) Insulate with PIR PB like the rest, on the underside. The problem here is that the access hatch is hard against the ceiling and I don't think it would be big enough to use if I make it significantly shorter. It would also look a bit weird if I stopped the insulation layer short to allow for the hatch. If I put a false ceiling below the level of the hatch, it would make a pretty oppressively low ceiling. Take the roof tiles off and insulate everything from above. Access from one side is pretty good, although I would need scaffolding to take the other side off. Main problem is it could be a very bad time of year to start doing that, especially when I only have weekends. It also seems a bit OTT just to get some insulation in. I can't help feeling I'm missing an easier solution (apart from not bothering!). I'm banking on someone here being able to provide me with some inspiration or experience of this. |
Ceiling / loft insulation: What am I missing?
On Sunday, October 5, 2014 8:36:40 PM UTC+1, GMM wrote:
I'd like to insulate the bathroom. The walls will have to wait until I re-furb the whole thing properly, but I thought the ceiling would be a good place to start. The ceiling is in three sections, following the shape of the rafters. (a slopey bit each side and a horizontal bit under the collar beam in the middle. I bet there's a name for that shape, but I can't find it.) The sloped sections should be trivial(-ish): Just PIR PB following the shape. The horizontal section has a space above and, on the (internal) end wall, a hatch gives access to the void above the corridor outside and (I thought) the space above this ceiling. Clambering up there, I find this 'internal gable' end is bricked up, though a helpful electrician has removed a couple of bricks so I can see in. A lot of the space (which is smaller than I expected but I should be able to crawl into if I had access) is filled with the debris of a historic re-roofing job, that will have to come out before insulating. So my problem is access and I could do one of the following: Cut more bricks out of the gable until I can get in. My reservation is that the bricks are presumably there for a reason, so I would have to do something fancy to maintain the structural strength. (Though it's not clear why the rafters don't do that.) Insulate with PIR PB like the rest, on the underside. The problem here is that the access hatch is hard against the ceiling and I don't think it would be big enough to use if I make it significantly shorter. It would also look a bit weird if I stopped the insulation layer short to allow for the hatch. If I put a false ceiling below the level of the hatch, it would make a pretty oppressively low ceiling. Take the roof tiles off and insulate everything from above. Access from one side is pretty good, although I would need scaffolding to take the other side off. Main problem is it could be a very bad time of year to start doing that, especially when I only have weekends. It also seems a bit OTT just to get some insulation in. I can't help feeling I'm missing an easier solution (apart from not bothering!). I'm banking on someone here being able to provide me with some inspiration or experience of this. 1 more option: chuck loosefill rockwool or cellulose in through the 2 brick gap. Bit bigger hole & you can aim. It doesnt have to be perfect. NT |
Ceiling / loft insulation: What am I missing?
|
Ceiling / loft insulation: What am I missing?
On 05/10/14 20:36, GMM wrote:
I'd like to insulate the bathroom. The walls will have to wait until I re-furb the whole thing properly, but I thought the ceiling would be a good place to start. Pictures would make it easier to understand :) |
Ceiling / loft insulation: What am I missing?
On Sunday, October 5, 2014 10:12:06 PM UTC+1, GMM wrote:
On 05/10/2014 20:43, wrote: On Sunday, October 5, 2014 8:36:40 PM UTC+1, GMM wrote: I'd like to insulate the bathroom. The walls will have to wait until I re-furb the whole thing properly, but I thought the ceiling would be a good place to start. The ceiling is in three sections, following the shape of the rafters. (a slopey bit each side and a horizontal bit under the collar beam in the middle. I bet there's a name for that shape, but I can't find it.) The sloped sections should be trivial(-ish): Just PIR PB following the shape. The horizontal section has a space above and, on the (internal) end wall, a hatch gives access to the void above the corridor outside and (I thought) the space above this ceiling. Clambering up there, I find this 'internal gable' end is bricked up, though a helpful electrician has removed a couple of bricks so I can see in. A lot of the space (which is smaller than I expected but I should be able to crawl into if I had access) is filled with the debris of a historic re-roofing job, that will have to come out before insulating. So my problem is access and I could do one of the following: Cut more bricks out of the gable until I can get in. My reservation is that the bricks are presumably there for a reason, so I would have to do something fancy to maintain the structural strength. (Though it's not clear why the rafters don't do that.) Insulate with PIR PB like the rest, on the underside. The problem here is that the access hatch is hard against the ceiling and I don't think it would be big enough to use if I make it significantly shorter. It would also look a bit weird if I stopped the insulation layer short to allow for the hatch. If I put a false ceiling below the level of the hatch, it would make a pretty oppressively low ceiling. Take the roof tiles off and insulate everything from above. Access from one side is pretty good, although I would need scaffolding to take the other side off. Main problem is it could be a very bad time of year to start doing that, especially when I only have weekends. It also seems a bit OTT just to get some insulation in. I can't help feeling I'm missing an easier solution (apart from not bothering!). I'm banking on someone here being able to provide me with some inspiration or experience of this. 1 more option: chuck loosefill rockwool or cellulose in through the 2 brick gap. Bit bigger hole & you can aim. It doesnt have to be perfect. I did think whether there was something I could do with loose stuff but all the rubbish up there would still need to come out first. Not sure how successful I'd be, trying to throw it 14 feet through a 2 brick sized hole though... That's the sort of info we need. Can't comment on the rubbish, typical building debris could be left in situ if need be. Also dont know whether you'd be better making an access hole to get in, or blowing insulation in through a set of holes in the plaster. And the hatch situation is a mystery. Gis a clue! :) NT |
Ceiling / loft insulation: What am I missing?
On 05/10/2014 22:21, Tim Watts wrote:
On 05/10/14 20:36, GMM wrote: I'd like to insulate the bathroom. The walls will have to wait until I re-furb the whole thing properly, but I thought the ceiling would be a good place to start. Pictures would make it easier to understand :) Could take a while, given the way work is at the moment, but I'll have a go asap.... |