UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions.

 
 
LinkBack Thread Tools Search this Thread Display Modes
Prev Previous Post   Next Post Next
  #1   Report Post  
Chris Wilkins
 
Posts: n/a
Default Proceedure in pressurising expansion vessel in combination boiler.

I have a Worcester Heatslave 9.24 RSF combination boiler to heat my
one floor three bedroon flat.

I have had to drain and replace a diverter valve.

The expansion vessel should be prepressured to 0.5 and would like to
check this but have some questions at what stage should the 0.5 bar be
read.

Q1. What is the correct proceedure in pressurising the expansion
vessel. Before the system is pressurised with water or after, or does
it matter.

Q2. Will the expansion vessel pressure reading be different if the
system is filled and pressured with water. ie. if the system pressure
is 1.2 bar should the pressure at the expansion vessel read 1.7 bar
(0.5 expansion pressure + 1.2 system pressure)
OR will the expanison vessel read 0.5 regardless of the system
pressure?

Chris...
 
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT +1. The time now is 07:17 AM.

Powered by vBulletin® Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Copyright ©2004-2025 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"