Part P notification questions
I have been in discussion with a Project Surveyor of a certain London
Borough with regards to some 'jobs' I need done around my bathroom. I am suspicious the advice he has given is incorrect (not based on my opinion, but articles on the web from the ODPM, NICIEC), I would appreciate some advice. Do I need Building Regulations approval with regards to Part P. The Electrical work would be carried comply with BS 7671: 2001, and the boiler has already been installed by a Corgi Registered Installer. For each of the following jobs: - replace an existing boiler in a Bathroom - replace a Shaver Socket in a Bathroom - earth bonding in a Bathroom thanks gna |
Part P notification questions
wrote in message oups.com... I have been in discussion with a Project Surveyor of a certain London Borough with regards to some 'jobs' I need done around my bathroom. I am suspicious the advice he has given is incorrect (not based on my opinion, but articles on the web from the ODPM, NICIEC), I would appreciate some advice. Do I need Building Regulations approval with regards to Part P. The Electrical work would be carried comply with BS 7671: 2001, and the boiler has already been installed by a Corgi Registered Installer. For each of the following jobs: - replace an existing boiler in a Bathroom No, provided it's like for like replacement. If you have to add anything it becomes notifiable. - replace a Shaver Socket in a Bathroom As above - earth bonding in a Bathroom I reckon not, because you're not adding any points, but then again, you are adding cables in a special location so maybe yes. See the table on Page 8 of Approved Document P (from ODPM website) HTH Trev. thanks gna |
All times are GMT +1. The time now is 11:47 PM. |
Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004 - 2014 DIYbanter