Well after contemplating several options, have decided to pour a concrete
slab for 12 x 16 shed....what I have done so far is to remove sod and put up
forms. On one side the top of forms are about 4" above grade, and the other
side witch is 5' from property line, top of forms are about 10" above
grade. Also I am in Michigan so 42" frost line and I do not have great
drainage, but have chosen a location that is higher. I plan to pour 4" slab.


Am thinking to dig out one side to about 6" depth and fill with couple
inches of sand..the other side will need to be filled more, my neighbor says
just fill with sand, but I think I should fill with 4 or 5 inches of
crushed limestone then inch or two of sand on top....is this one of those 6
of one half dozen of the other type deals?

should I put a footing around perimeter? if so how big? or would that be
overkill. and would a footing say 1' deep by 1' wide be a problem with
frost? what about just pouring concrete 6" thick at perimeter, would that
be ok?

With the drainage issues here, think I need a moisture barrier....What
should I use?

also thinking 3/8 rebar - spaced about 18" sound right?

any advise appreciated.

rlz August 1st 09 11:02 PM

concrete slab for shed
 
On Aug 1, 1:15*pm, wrote:
Well after contemplating several options, have decided to pour a concrete
slab for 12 x 16 shed....what I have done so far is to remove sod and put up
forms. On one side the top of forms are about 4" above grade, and the other
side witch is *5' from property line, top of forms are about 10" above
grade. *Also I am in Michigan so 42" frost line and I do not have great
drainage, but have chosen a location that is higher. I plan to pour 4" slab.

Am thinking to dig out one side to about 6" depth and fill with couple
inches of sand..the other side will need to be filled more, my neighbor says
just fill with sand, but I think I should *fill with 4 or 5 inches of
crushed limestone then inch or two of sand on top....is this one of those 6
of one half dozen of the other type deals?

should I put a footing around perimeter? if so how big? or would that be
overkill. and would a footing say 1' deep by 1' wide be a *problem with
frost? *what about just pouring concrete 6" thick at perimeter, would that
be ok?

With the drainage issues here, think I need a moisture barrier....What
should I use?

also thinking 3/8 rebar - spaced about 18" sound right?

any advise appreciated.


I recently poured a 18'x22' slab for a workshop and had a foot
difference in grade between the short ends. Our city inspectors
required the top of the slab to be 6" above grade and a foot below
grade around the parimeter. The perimeter trench had to be a minimum
of 8" in width and then sloped inward toward the center. They also
wanted #4 rebar to go inside the trench 3" from the bottom and 3"
inches from the top. Also remember to put in anchor bolts for your
wall studs when pouring the concrete to anchor your walls.

My best advice is to consult with the city inspectors if you're
required to pull a permit.

Have fun doing the job.

Robin

EXT August 2nd 09 01:14 AM

concrete slab for shed
 
rlz wrote:
On Aug 1, 1:15 pm, wrote:
Well after contemplating several options, have decided to pour a
concrete slab for 12 x 16 shed....what I have done so far is to
remove sod and put up forms. On one side the top of forms are about
4" above grade, and the other side witch is 5' from property line,
top of forms are about 10" above grade. Also I am in Michigan so
42" frost line and I do not have great drainage, but have chosen a
location that is higher. I plan to pour 4" slab.

Am thinking to dig out one side to about 6" depth and fill with
couple inches of sand..the other side will need to be filled more,
my neighbor says just fill with sand, but I think I should fill
with 4 or 5 inches of crushed limestone then inch or two of sand on
top....is this one of those 6 of one half dozen of the other type
deals?

should I put a footing around perimeter? if so how big? or would
that be overkill. and would a footing say 1' deep by 1' wide be a
problem with frost? what about just pouring concrete 6" thick at
perimeter, would that be ok?

With the drainage issues here, think I need a moisture
barrier....What should I use?

also thinking 3/8 rebar - spaced about 18" sound right?

any advise appreciated.


I recently poured a 18'x22' slab for a workshop and had a foot
difference in grade between the short ends. Our city inspectors
required the top of the slab to be 6" above grade and a foot below
grade around the parimeter. The perimeter trench had to be a minimum
of 8" in width and then sloped inward toward the center. They also
wanted #4 rebar to go inside the trench 3" from the bottom and 3"
inches from the top. Also remember to put in anchor bolts for your
wall studs when pouring the concrete to anchor your walls.

My best advice is to consult with the city inspectors if you're
required to pull a permit.

Have fun doing the job.

Robin


You cannot have too much re-rod. Don't use the #3 size, go for the 1/2" or
#4 size. I built a shed foundation, 5" slab with 16" deep stiffeners all
around. Had a source for some free re-bar and dropped 320 lineal feet into
the foundation. That was 25 years ago, not a crack in it. This is in the
Toronto area of Canada with a 48" frost line.


benick[_2_] August 2nd 09 02:34 AM

concrete slab for shed
 

"EXT" wrote in message
anews.com...
rlz wrote:
On Aug 1, 1:15 pm, wrote:
Well after contemplating several options, have decided to pour a
concrete slab for 12 x 16 shed....what I have done so far is to
remove sod and put up forms. On one side the top of forms are about
4" above grade, and the other side witch is 5' from property line,
top of forms are about 10" above grade. Also I am in Michigan so
42" frost line and I do not have great drainage, but have chosen a
location that is higher. I plan to pour 4" slab.

Am thinking to dig out one side to about 6" depth and fill with
couple inches of sand..the other side will need to be filled more,
my neighbor says just fill with sand, but I think I should fill
with 4 or 5 inches of crushed limestone then inch or two of sand on
top....is this one of those 6 of one half dozen of the other type
deals?

should I put a footing around perimeter? if so how big? or would
that be overkill. and would a footing say 1' deep by 1' wide be a
problem with frost? what about just pouring concrete 6" thick at
perimeter, would that be ok?

With the drainage issues here, think I need a moisture
barrier....What should I use?

also thinking 3/8 rebar - spaced about 18" sound right?

any advise appreciated.


I recently poured a 18'x22' slab for a workshop and had a foot
difference in grade between the short ends. Our city inspectors
required the top of the slab to be 6" above grade and a foot below
grade around the parimeter. The perimeter trench had to be a minimum
of 8" in width and then sloped inward toward the center. They also
wanted #4 rebar to go inside the trench 3" from the bottom and 3"
inches from the top. Also remember to put in anchor bolts for your
wall studs when pouring the concrete to anchor your walls.

My best advice is to consult with the city inspectors if you're
required to pull a permit.

Have fun doing the job.

Robin


You cannot have too much re-rod. Don't use the #3 size, go for the 1/2" or
#4 size. I built a shed foundation, 5" slab with 16" deep stiffeners all
around. Had a source for some free re-bar and dropped 320 lineal feet into
the foundation. That was 25 years ago, not a crack in it. This is in the
Toronto area of Canada with a 48" frost line.


If you're gonna do a slab for your shed , you more than likely need a
permit...Best to start with that and then get back to us with those
specs...Without knowing what YOUR building codes are we will just be wasting
time trying to tell you what to do....


[email protected] August 2nd 09 01:28 PM

concrete slab for shed
 
On Aug 1, 9:34*pm, "benick" wrote:
"EXT" wrote in message

anews.com...





rlz wrote:
On Aug 1, 1:15 pm, wrote:
Well after contemplating several options, have decided to pour a
concrete slab for 12 x 16 shed....what I have done so far is to
remove sod and put up forms. On one side the top of forms are about
4" above grade, and the other side witch is 5' from property line,
top of forms are about 10" above grade. Also I am in Michigan so
42" frost line and I do not have great drainage, but have chosen a
location that is higher. I plan to pour 4" slab.


Am thinking to dig out one side to about 6" depth and fill with
couple inches of sand..the other side will need to be filled more,
my neighbor says just fill with sand, but I think I should fill
with 4 or 5 inches of crushed limestone then inch or two of sand on
top....is this one of those 6 of one half dozen of the other type
deals?


should I put a footing around perimeter? if so how big? or would
that be overkill. and would a footing say 1' deep by 1' wide be a
problem with frost? what about just pouring concrete 6" thick at
perimeter, would that be ok?


With the drainage issues here, think I need a moisture
barrier....What should I use?


also thinking 3/8 rebar - spaced about 18" sound right?


any advise appreciated.


I recently poured a 18'x22' slab for a workshop and had a foot
difference in grade between the short ends. Our city inspectors
required the top of the slab to be 6" above grade and a foot below
grade around the parimeter. *The perimeter trench had to be a minimum
of 8" in width and then sloped inward toward the center. *They also
wanted #4 rebar *to go inside the trench 3" from the bottom and 3"
inches from the top. *Also remember to put in anchor bolts for your
wall studs when pouring the concrete to anchor your walls.


My best advice is to consult with the city inspectors if you're
required to pull a permit.


Have fun doing the job.


Robin


You cannot have too much re-rod. Don't use the #3 size, go for the 1/2" or
#4 size. I built a shed foundation, 5" slab with 16" deep stiffeners all
around. Had a source for some free re-bar and dropped 320 lineal feet into
the foundation. That was 25 years ago, not a crack in it. This is in the
Toronto area of Canada with a 48" frost line.


If you're gonna do a slab for your shed , you more than likely need a
permit...Best to start with that and then get back to us with those
specs...Without knowing what YOUR building codes are we will just be wasting
time trying to tell you what to do....- Hide quoted text -

- Show quoted text -


Along those lines, in many places you can't put a shed 5 ft from your
property line. A larger clearance is required. Given the other
conditions, ie Mich winters, a concrete slab would not be my choice
for this application.

[email protected] August 2nd 09 02:39 PM

concrete slab for shed
 
There is no permit required if shed is under 200 sq ft. shed can be 5' from
property line as long as it has eve trough. I can build it any way I want
according to building inspector. my neighbor built a shed few years ago,
little smaller than mine. same conditions I have. He poured 4" concrete slab
that he filled several inches with sand to level, roughly the same as I am
doing, and he used no steel no moisture barrier, and no footing. He did
place one row of blocks, and advised me to do the same.(I was planning to
construct walls directly on slab but he says 2x4 plates at bottom of wall
will rot) He filled and raised area around slab with black dirt and sloped
away. so far he is in pretty good shape he is farther from property line
though. he has been having some minor moisture problems......would like to
know if I put in quality moisture barrier can I then build on slab? Thanks

Buddy[_2_] August 2nd 09 04:20 PM

concrete slab for shed
 
On Aug 2, 9:39*am, wrote:
There is no permit required if shed is under 200 sq ft. shed can be 5' from
property line as long as it has eve trough. I can build it any way I want
according to building inspector. my neighbor built a shed few years ago,
little smaller than mine. same conditions I have. He poured 4" concrete slab
that he filled several inches with sand to level, roughly the same as I am
doing, and he used no steel no moisture barrier, and no footing. He did
place one row of blocks, and advised me to do the same.(I was planning to
construct walls directly on slab but he says 2x4 plates at bottom of wall
will rot) *He filled and raised area around slab with black dirt and sloped
away. so far he is in pretty good shape he is farther from property line
though. he has been having some minor moisture problems......would like to
know if I put in quality moisture barrier can I then build on slab? *Thanks


Plastic vapor barrier would keep slab drier. Use some rebar, even old
fence wire is better than no steel at all. The blocks he used is
acting as a footing, but a floating slab is all we use in Florida. Up
there, is best to have a footing below frost line to prevent heaving.

Joe August 2nd 09 04:35 PM

concrete slab for shed
 
On Aug 1, 2:15*pm, wrote:
Well after contemplating several options, have decided to pour a concrete
slab for 12 x 16 shed....what I have done so far is to remove sod and put up
forms. On one side the top of forms are about 4" above grade, and the other
side witch is *5' from property line, top of forms are about 10" above
grade. *Also I am in Michigan so 42" frost line and I do not have great
drainage, but have chosen a location that is higher. I plan to pour 4" slab.

Am thinking to dig out one side to about 6" depth and fill with couple
inches of sand..the other side will need to be filled more, my neighbor says
just fill with sand, but I think I should *fill with 4 or 5 inches of
crushed limestone then inch or two of sand on top....is this one of those 6
of one half dozen of the other type deals?

should I put a footing around perimeter? if so how big? or would that be
overkill. and would a footing say 1' deep by 1' wide be a *problem with
frost? *what about just pouring concrete 6" thick at perimeter, would that
be ok?

With the drainage issues here, think I need a moisture barrier....What
should I use?

also thinking 3/8 rebar - spaced about 18" sound right?

any advise appreciated.


Building inspectors, newsgroup warriors, friends, all are good sources
of ideas. But don't forget to ask the people who deal with concrete
every day, your ready mix supplier and the finishers. Keep in mind
that sand is a poor base for concrete compared to pea gravel. Your
building code may even specify it for larger slabs, so logically it
would be best for yours.

Joe

Rudy August 3rd 09 02:49 AM

concrete slab for shed
 

He poured 4" concrete slab that he filled several inches with sand to
level


I wouldn't recommend the use of "Sand" for your concrete slab base. Sand
can wash out and isnt structurally solid unless it's contained within a
footing/foundation.
The norm seems to be a *compacted* layer of sand/mixed gravel (around here
they call it "road base"- other locale calls it Navvy Jack..a
sand/gravel/crushed rock type mixture used for making concrete). Thats what
I put under my concrete driveway and back porch slabs 5 years ago. No
problems so far.

As far as the plastic vapor barrier goes: code here calls for a tamped sand
base (within the foundation). Over that they place a 6 mil vapor
barrier..seams taped with Red Tuck Tape. Over that they poured the floor.
This is for "inside". Its your call if you want to use one outside for
your shed.
The gravel base should provide any drainage necessary under your slab (as
long as you provide a way for any sub-slab water/moisture to flow away) so
there shouldn't be any moisture concerns.



benick[_2_] August 3rd 09 06:04 AM

concrete slab for shed
 

wrote in message
...
There is no permit required if shed is under 200 sq ft. shed can be 5'
from
property line as long as it has eve trough. I can build it any way I want
according to building inspector. my neighbor built a shed few years ago,
little smaller than mine. same conditions I have. He poured 4" concrete
slab
that he filled several inches with sand to level, roughly the same as I am
doing, and he used no steel no moisture barrier, and no footing. He did
place one row of blocks, and advised me to do the same.(I was planning to
construct walls directly on slab but he says 2x4 plates at bottom of wall
will rot) He filled and raised area around slab with black dirt and
sloped
away. so far he is in pretty good shape he is farther from property line
though. he has been having some minor moisture problems......would like to
know if I put in quality moisture barrier can I then build on slab?
Thanks


All the slabs I've seen here in Maine have an above grade compacted gravel
pad under the concrete slab so water will drain and run AWAY from it...As
has already been pointed out , the moisture barrier is for inside floors
like in a basement....Never seen one under a slab in a garage or shed , but
whatever..The only thing I've seen under a slab is Styrofoam panels to
minamize frost movement.....Bottom plate on the slab should be PT and won't
rot but concidering how your neighbor did his I can see his
concern...LOL.......But you sound as if you want to build it like your
neighbors and have your mind already made up....Let us know how it works
out....



All times are GMT +1. The time now is 04:46 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004 - 2014 DIYbanter