Home |
Search |
Today's Posts |
|
Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems. |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to alt.building.construction,alt.home.repair
|
|||
|
|||
Anticipating an addition
Planning to build a 3-season cabin in northern WI (sandy soil, 100' from a
lake, weather extremes but no earthquakes). To spread the costs I'll get by with a sand point well and a privy at first, add indoor plumbing a few years later. One option is to contract with a company that builds garages and cabins. They frame the walls in their factory, erect on a reinforced concrete slab over 12" sand buildup. They've been doing these for 20 years Here come the questions. When it comes time for water and septic, I can think of 3 options: 1) Break up the floor and somehow run plumbing underneath. Is this the usual practice? Is this even practical? The other options would mean putting up a small addition (I may be able do this myself) to hold the pressure tank, water heater and bathroom, route supply and drain lines through the wall for the kitchen sink. 2) Build this on another slab. Do I need to tie the 2 slabs together and how is it done? 3) Build it over a crawl space (to hold the tank and heater). Is it even possible to tie the 2 structures together -- one on a slab, one with frost footers -- and how? And what else am I missing here? TIA |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Request for addition to a uk.d-i-y FAQ. | UK diy | |||
help on sunroom addition | Home Repair | |||
Addition | Home Repair | |||
Website Addition | Woodworking | |||
while *laying* carpet; anticipating human "cow-trails"? | Home Repair |