Wayne Whitney |
March 3rd 08 11:33 PM |
Multiple room floor refinishing question
On 2008-03-03, wrote:
My question is if I do each room (stopping at the door threshold)
and allowing the bedroom floors to dry before doing the hallway will
I end up with noticeable transition points in the doorways? Any
suggestions on how to avoid this problem?
If there's a threshold piece, you could remove it, finish it
separately, and reinstall it to cover the transition line in the
finish.
If not, you mentioned doing three rooms on a hallway. So you should
only need to do one "cold joint", since you can start in a room, work
towards the hallway, do the hallway, and then do a second room. I
like the suggestion of trying to make the cold joint exactly coincide
with the edge of a board, but I don't really know.
Cheers, Wayne
|
All times are GMT +1. The time now is 12:12 PM. |
|
Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004 - 2014 DIYbanter