Home |
Search |
Today's Posts |
|
Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems. |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
I finished about 1400 sq. ft. of my basement with about 46 4x8 sheets
of drywall. All the sheets are standing up so the tapered ends are butted together. Each seam is about 7 feet long. There are 9 inside 90-degree corners, 5 outside 90-degree corners and two approximately 120-degree inside corners. I'm going to be looking for someone put on the outside corner metals & tape/mud/sand. For the typical contractor, is this a job that can be completed in a weekend? I know it will depend on the crew size but I'm not sure what a crew of any size can get done in a day. Thanks, Kevin |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Mud bottom of drywall? | Home Repair | |||
how much drywall mud? | Home Repair | |||
Fiberglass mesh or paper tape for mud joints? | Home Repair | |||
? about paint and drywall mud | Home Repair |