Default Drywalling?! Painting & Plastering!??

I hired a contractor to redo a couple of rooms at a new house. I was
to be responsible for the painting. Except the contractor then said
painting meant painting and plastering. I got a painting guy to go in
and look at the place now that the contractor says it's ready to be
plastered and painted, and the painter is shaking his head at all the
drywalling. There has been no plastering
or taping done. the drywall is stuck up against the old walls,
against the ceiling, as is, with no kind of marking or taping or
plastering over the seams, over the holes, whatever.

The painter is telling me that that kind of thing is part of
drywalling. That he's almost never seen it not done by the drywaller.
He says if his guys have to do the taping and first plastering over
the drywalling it's going to cost a lot more because they really don't
have a lot of experience and it will take longer. In fact, he'd have
to subcontract to a drywaller. The second and third plaster coats are
fine, they do them all the time, he says. The contractor seems to be
saying that all taping and plastering is part of the plaster/painting
process. Does anyone have experience with drywalling? Is it normal for
the drywaller to just put up the drywall against the frame and do no
kind of plastering or taping to meld it against the walls and roof?

If there is an understanding that I'm responsible for painting and
plastering is the contractor being reasonable by doing nothing more
than he's already done?

I'm supposed to be moving in there in a week, and the painter is
telling me that there's no way he can finish in time if his guys have
to do the first plaster and taping, so this is really important.



  #2   Report Post  
Bill Waller
 
Posts: n/a
Default

On Thu, 5 May 2005 19:22:23 -0400, "Jacob Moore" wrote:

I hired a contractor to redo a couple of rooms at a new house. I was
to be responsible for the painting. Except the contractor then said
painting meant painting and plastering. I got a painting guy to go in
and look at the place now that the contractor says it's ready to be
plastered and painted, and the painter is shaking his head at all the
drywalling. There has been no plastering
or taping done. the drywall is stuck up against the old walls,
against the ceiling, as is, with no kind of marking or taping or
plastering over the seams, over the holes, whatever.

The painter is telling me that that kind of thing is part of
drywalling. That he's almost never seen it not done by the drywaller.
He says if his guys have to do the taping and first plastering over
the drywalling it's going to cost a lot more because they really don't
have a lot of experience and it will take longer. In fact, he'd have
to subcontract to a drywaller. The second and third plaster coats are
fine, they do them all the time, he says. The contractor seems to be
saying that all taping and plastering is part of the plaster/painting
process. Does anyone have experience with drywalling? Is it normal for
the drywaller to just put up the drywall against the frame and do no
kind of plastering or taping to meld it against the walls and roof?

If there is an understanding that I'm responsible for painting and
plastering is the contractor being reasonable by doing nothing more
than he's already done?

I'm supposed to be moving in there in a week, and the painter is
telling me that there's no way he can finish in time if his guys have
to do the first plaster and taping, so this is really important.


My experience with drywall contractors has been that one outfit hangs the
sheetrock. Another company comes in and does the taping and mud work. Then the
painter comes in and does his thing. It's ugly, but that's how they have the
work divided up.

On one contract, I did find someone who would do the hang and the mud work, but
he complained bitterly and I probably paid too much.

On my last contract, I hired a carpenter buddy who was willing to hang and mud,
but even he complained. :-(

If you are talking skim coat, that is a whole other story, one of which I am
glad to say, I have never experienced.

____________________
Bill Waller
New Eagle, PA


  #3   Report Post  
Hopkins
 
Posts: n/a
Default

My experience in this is that painters paint. At best the painter may
have to repair dings and the like from other trades doing their thing.

Runinng tape and mudding is the job of the drywall contractor. Maybe he
subs out one of the two, or has separate crews for each, but it's part
of his job.

No builder I've ever dealt with expects the painter to tape and mud.
What your painter is telling you is correct.

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Camp Painting help Needed ! TURTLE Home Repair 14 February 19th 05 10:17 PM
Painting plaster Vs papering then painting Tim Downie UK diy 2 October 26th 04 10:54 AM
World's Best Natural Sea Sponges Available From Tarpon Springs, FL Faux Painting, Sponge Painting, Home Decor tarponspongecompany Home Repair 0 June 8th 04 04:43 AM
lime plastering - expected costs vs gypsum Stephen Fasham UK diy 42 May 22nd 04 03:59 PM
Wall preparation before plastering + painting David Hearn UK diy 1 September 29th 03 11:50 AM


All times are GMT +1. The time now is 12:19 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"