tom patton wrote:

Just putting steel reinforcing mesh in my 150 by 600 foundations about 13
metre run.
My brother in law-a civil engineer said just set the bottom layer on some
bits of broken paving slab then use u shaped upstands to wire on the top
layer both must be bedde 50 mm from the exterior.
I mentioned my method to the brickie he was horrified for gods sake dont put
any lumps on the foundation base.
How is this supposed to be done--there must be a simple method.


I went the half brick route on my shed base - and wired together the
rebar at some of the crossovers to keep it all in place.

--
Cheers,

John.

/================================================== ===============\