View Single Post
  #2   Report Post  
Mark & Mary Ann Weiss
 
Posts: n/a
Default

23. Replace the gas pipes
24. Replace the entire roof. shingles, boards, trusses, etc.
25. Replace all the interior and exterior walls including the studs,
plaster, siding, mouldings, etc.
26. Replace the entire foundation

I hope I got this in the right order. Please let me know.

By the way, I plan to tell the builder to use the old doorbell, that
works fine, and I am trying to save some money.



Just get a D9 Caterpillar bulldozer and save yourself on the inventory of
items. :-)


--
Take care,

Mark & Mary Ann Weiss

VIDEO PRODUCTION • FILM SCANNING • DVD MASTERING • AUDIO RESTORATION
Hear my Kurzweil Creations at: http://www.dv-clips.com/theater.htm
Business sites at:
www.dv-clips.com
www.mwcomms.com
www.adventuresinanimemusic.com
-