View Single Post
  #1   Report Post  
Posted to alt.binaries.pictures.woodworking
jloomis[_2_] jloomis[_2_] is offline
external usenet poster
 
Posts: 392
Default Window Installation

Enjoyed the completion of another difficult job.
Take out the old and put in the new, along with a new roof.
Not only was it knee work, but back bending......the roof was at least 120o
during most of the 3 days.
I think my metal hammer felt like a frying pan on a hot griddle.
6 window installs.....
I do like the sticky tape we use now.
And also caulking after siding is installed on window edges.....
john