View Single Post
  #2   Report Post  
Dave Plowman
 
Posts: n/a
Default How to fit lead flashing into brickwork?

In article ,
Cubik wrote:
How is the flashing usually fitted between the bricks? I'm assuming it
is inserted where the mortar joint would be by a couple of inches and
fixed in place using some kind of adhesive/sealant - Is this correct.


More usually by about an inch, and jammed in place at intervals by scraps
of folded lead. Then simply pointed over. You need to make sure it can't
move until the mortar sets.

--
*You can't have everything, where would you put it?

Dave Plowman London SW 12
RIP Acorn