"Pet @ www.gymratz.co.uk" wrote in message
.uk...
how dry is a dry mix?
this is for a thin screed over UFH

My mate said it's like the consistency of Apple crumble topping, but is
there a more usefull way of working out what dry really is?


Sand / cement dry screed needs to be about 1" to 11/2" thick. mix damp sand
with cement and voila. Use a float to work it quite easily into a lovely
flat finish. No good as a thin layer, eventually it will lift.


  #2   Report Post  
Pet @ www.gymratz.co.uk
 
Posts: n/a
Default "Dry" mix screed

how dry is a dry mix?
this is for a thin screed over UFH

My mate said it's like the consistency of Apple crumble topping, but is
there a more usefull way of working out what dry really is?

--
http://gymratz.co.uk - Best Gym Equipment & Bodybuilding Supplements UK.
http://trade-price-supplements.co.uk - TRADE PRICED SUPPLEMENTS for ALL!
http://fitness-equipment-uk.com - UK's No.1 Fitness Equipment Suppliers.
http://gymratz.co.uk/hot-seat.htm - Live web-cam! (sometimes)
  #3   Report Post  
Rick Dipper
 
Posts: n/a
Default

On Mon, 06 Dec 2004 18:28:29 GMT, "Pet @ www.gymratz.co.uk"
wrote:

how dry is a dry mix?
this is for a thin screed over UFH

My mate said it's like the consistency of Apple crumble topping, but is
there a more usefull way of working out what dry really is?


Ask the cheif cook in your house to do the mixing, or at least
supervise the adding of water ..........

Rick

  #4   Report Post  
The Natural Philosopher
 
Posts: n/a
Default

Pet @ www.gymratz.co.uk wrote:

how dry is a dry mix?
this is for a thin screed over UFH

My mate said it's like the consistency of Apple crumble topping, but is
there a more usefull way of working out what dry really is?

If its too wet it slumps.

It can almost be as dry as you like frankly. It will in time set no
matter how little water there is in it.

Being as how this is a dampish sort of planet.
  #5   Report Post  
Pet @ www.gymratz.co.uk
 
Posts: n/a
Default

Omri wrote:

Sand / cement dry screed needs to be about 1" to 11/2" thick. mix damp sand
with cement and voila. Use a float to work it quite easily into a lovely
flat finish. No good as a thin layer, eventually it will lift.


It's suggested by Newheat at a depth of 15 mm as a heat diffuser instead
of their optional aluminium spreader plates that go around the pipe.

--
http://gymratz.co.uk - Best Gym Equipment & Bodybuilding Supplements UK.
http://trade-price-supplements.co.uk - TRADE PRICED SUPPLEMENTS for ALL!
http://fitness-equipment-uk.com - UK's No.1 Fitness Equipment Suppliers.
http://gymratz.co.uk/hot-seat.htm - Live web-cam! (sometimes)


  #6   Report Post  
Pet @ www.gymratz.co.uk
 
Posts: n/a
Default

The Natural Philosopher wrote:

If its too wet it slumps.

It can almost be as dry as you like frankly. It will in time set no
matter how little water there is in it.


that makes things easier then, I presume the moisture from the sand will
be more than adequate for "setting" purposes then.

Though they do suggest leaving the heating on for 2 weeks before laying
chipboard on top for it to set.

--
http://gymratz.co.uk - Best Gym Equipment & Bodybuilding Supplements UK.
http://trade-price-supplements.co.uk - TRADE PRICED SUPPLEMENTS for ALL!
http://fitness-equipment-uk.com - UK's No.1 Fitness Equipment Suppliers.
http://gymratz.co.uk/hot-seat.htm - Live web-cam! (sometimes)
  #7   Report Post  
The Natural Philosopher
 
Posts: n/a
Default

Pet @ www.gymratz.co.uk wrote:

The Natural Philosopher wrote:

If its too wet it slumps.

It can almost be as dry as you like frankly. It will in time set no
matter how little water there is in it.



that makes things easier then, I presume the moisture from the sand will
be more than adequate for "setting" purposes then.

Though they do suggest leaving the heating on for 2 weeks before laying
chipboard on top for it to set.

Why stik chipboard over it?

Screed it flat enough for carpet, or use real wood flooring, or tile or
slate it..


  #8   Report Post  
Pet @ www.gymratz.co.uk
 
Posts: n/a
Default

The Natural Philosopher wrote:

Why stik chipboard over it?


Because it's upstairs in our upsideown house, so, only acting to help
heat transfer from UFH pipes laid between joists (supported by 9mm
ply/batens/45mm cellotex)

http://gymratz.co.uk/pete/floor.JPG
(Rockwool for sound insulation purposes)

I have dilemma'd(?) over flooring surface, and real wood or engineered
(preferred on UFH) boards have been toyd with, but as we prolly want
tiles in the kitchen and bathroom area we need a flooring to put them
on, hence 18mm moisture resistant chipboard throughout. Then, probabally
a 7mm hardwood faced top layer.

Though the final surface still is not decided on, but a chipboard deck
on the joists is currently the favoured route as it can be laid quickly,
and would be liveable with no other surface down for wall/ceiling
decorating and kitchen fitting purposes etc.

--
http://gymratz.co.uk - Best Gym Equipment & Bodybuilding Supplements UK.
http://trade-price-supplements.co.uk - TRADE PRICED SUPPLEMENTS for ALL!
http://fitness-equipment-uk.com - UK's No.1 Fitness Equipment Suppliers.
http://gymratz.co.uk/hot-seat.htm - Live web-cam! (sometimes)
  #9   Report Post  
Rick Hughes
 
Posts: n/a
Default


"Pet @ www.gymratz.co.uk" wrote in message
.uk...
how dry is a dry mix?
this is for a thin screed over UFH



I laid many tonnes of screed over my Nu-Heat system, there is a full article
on this at - http://tinyurl.com/5m748

IMHO you need 65mm minimum, you can go lower but it WILL crack.

I used 75mm depth of fibre reinforced screed.


As to how dry, if you are buying it comes mixed correctly - if own mix, then
it should be mixed with minimum water, just enough that if you squeeze a
handful it will hold it's shape, without oozing any water or even making
your hand wet.

If own mixing best way is to damp down sand with a hose, no water added to
the drum.

A 4:1 mix is good enough .... you can buys bags of Fibrin fibre
reinforcement additives to add to your mix.

Underfloor heating is GREAT, no rads to worry about ... each room has it's
own digital temp control.
Really pleased with it.


Rick


  #10   Report Post  
Rick Hughes
 
Posts: n/a
Default


"Pet @ www.gymratz.co.uk" wrote in message
.uk...
The Natural Philosopher wrote:

If its too wet it slumps.

It can almost be as dry as you like frankly. It will in time set no
matter how little water there is in it.


that makes things easier then, I presume the moisture from the sand will
be more than adequate for "setting" purposes then.

Though they do suggest leaving the heating on for 2 weeks before laying
chipboard on top for it to set.



I would leave at least 1 week per 10mm of thickness, especially if putting
h/w flooring or tiles on top.
In fact damp it down with hose after first 48 Hrs, and cover with plastic to
stop it drying out - you want it to cure - not dry.

I treated all of mine with a Butyl sealer after 1 week - stops dusting.

Rick




  #11   Report Post  
Pet @ www.gymratz.co.uk
 
Posts: n/a
Default

Rick Hughes wrote:

I laid many tonnes of screed over my Nu-Heat system, there is a full article
on this at - http://tinyurl.com/5m748


Can't log in, Password rqd.
:¬(


IMHO you need 65mm minimum, you can go lower but it WILL crack.


NUheat say 15mm for between joists, that's what I'm going for as 65mm
would be a fair old weight to fall on me swede in the night!

I used 75mm depth of fibre reinforced screed.


As to how dry, if you are buying it comes mixed correctly - if own mix, then
it should be mixed with minimum water, just enough that if you squeeze a
handful it will hold it's shape, without oozing any water or even making
your hand wet.

If own mixing best way is to damp down sand with a hose, no water added to
the drum.


makes sense.

A 4:1 mix is good enough .... you can buys bags of Fibrin fibre
reinforcement additives to add to your mix.


Good idea. I will make a note.

Underfloor heating is GREAT, no rads to worry about ... each room has it's
own digital temp control.
Really pleased with it.



My mate has a NUheat system in his self-build bungalow. He's really
pleased too. One query I have though, is NU-heat are recommending going
away from individual programable stats to a more conventioanl timer &
basic room stats for simplicity of operation (Only one time/program to
set up) as they say 99.9 % of users had the individual programmers all
set up the same anyway.

What's your take on it?
I would have one room (study) which might be beneficial to have an
extended operation time on, but that's about it really.
How do you do yours?

Bear in mind, our downstairs bedrooms are on a seperate zone with the
original radiators (for the forseeable future at least)

--
http://gymratz.co.uk - Best Gym Equipment & Bodybuilding Supplements UK.
http://trade-price-supplements.co.uk - TRADE PRICED SUPPLEMENTS for ALL!
http://fitness-equipment-uk.com - UK's No.1 Fitness Equipment Suppliers.
http://gymratz.co.uk/hot-seat.htm - Live web-cam! (sometimes)
  #12   Report Post  
The Natural Philosopher
 
Posts: n/a
Default

Pet @ www.gymratz.co.uk wrote:

Rick Hughes wrote:

I laid many tonnes of screed over my Nu-Heat system, there is a full
article
on this at - http://tinyurl.com/5m748



Can't log in, Password rqd.
:¬(


IMHO you need 65mm minimum, you can go lower but it WILL crack.



NUheat say 15mm for between joists, that's what I'm going for as 65mm
would be a fair old weight to fall on me swede in the night!

I used 75mm depth of fibre reinforced screed.


As to how dry, if you are buying it comes mixed correctly - if own
mix, then
it should be mixed with minimum water, just enough that if you squeeze a
handful it will hold it's shape, without oozing any water or even making
your hand wet.

If own mixing best way is to damp down sand with a hose, no water
added to
the drum.



makes sense.

A 4:1 mix is good enough .... you can buys bags of Fibrin fibre
reinforcement additives to add to your mix.



Good idea. I will make a note.

Underfloor heating is GREAT, no rads to worry about ... each room has
it's
own digital temp control.
Really pleased with it.




My mate has a NUheat system in his self-build bungalow. He's really
pleased too. One query I have though, is NU-heat are recommending going
away from individual programable stats to a more conventioanl timer &
basic room stats for simplicity of operation (Only one time/program to
set up) as they say 99.9 % of users had the individual programmers all
set up the same anyway.

What's your take on it?
I would have one room (study) which might be beneficial to have an
extended operation time on, but that's about it really.
How do you do yours?

Bear in mind, our downstairs bedrooms are on a seperate zone with the
original radiators (for the forseeable future at least)

If its for heat transfer only,then presumably dry sand is barely worse.
And makes a good sound barrriere.

Kinda surprised, since most wet UFH I have seen merely relies on the air
to transfer heat upwrds to teh floorboards.


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Laying cable in screed floor Ken UK diy 3 October 26th 04 04:19 PM
Thin screed and underfloor heating? Paul Clarke UK diy 5 September 19th 03 09:53 PM
Screed floors David Oneill UK diy 1 July 16th 03 02:00 PM
latex screed on concrete floor Ian Johnson UK diy 0 July 9th 03 06:32 PM


All times are GMT +1. The time now is 10:10 AM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"