UK diy (uk.d-i-y) For the discussion of all topics related to diy (do-it-yourself) in the UK. All levels of experience and proficency are welcome to join in to ask questions or offer solutions.

Reply
 
LinkBack Thread Tools Search this Thread Display Modes
  #1   Report Post  
 
Posts: n/a
Default Part P notification questions

I have been in discussion with a Project Surveyor of a certain London
Borough with regards to some 'jobs' I need done around my bathroom. I
am suspicious the advice he has given is incorrect (not based on my
opinion, but articles on the web from the ODPM, NICIEC), I would
appreciate some advice.

Do I need Building Regulations approval with regards to Part P. The
Electrical work would be carried comply with BS 7671: 2001, and the
boiler has already been installed by a Corgi Registered Installer. For
each of the following jobs:

- replace an existing boiler in a Bathroom
- replace a Shaver Socket in a Bathroom
- earth bonding in a Bathroom

thanks
gna

  #2   Report Post  
TW
 
Posts: n/a
Default Part P notification questions


wrote in message
oups.com...
I have been in discussion with a Project Surveyor of a certain London
Borough with regards to some 'jobs' I need done around my bathroom. I
am suspicious the advice he has given is incorrect (not based on my
opinion, but articles on the web from the ODPM, NICIEC), I would
appreciate some advice.

Do I need Building Regulations approval with regards to Part P. The
Electrical work would be carried comply with BS 7671: 2001, and the
boiler has already been installed by a Corgi Registered Installer. For
each of the following jobs:

- replace an existing boiler in a Bathroom


No, provided it's like for like replacement. If you have to add anything it
becomes notifiable.


- replace a Shaver Socket in a Bathroom


As above

- earth bonding in a Bathroom


I reckon not, because you're not adding any points, but then again, you are
adding cables in a special location so maybe yes.

See the table on Page 8 of Approved Document P (from ODPM website)

HTH


Trev.


thanks
gna



Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
PEX Fresh Water system/repipe questions -l ong BobK207 Home Repair 1 March 13th 05 10:37 PM
ODPM admits Part P consulation flawed Owain UK diy 24 January 5th 05 10:49 PM
Part P - new cable colours CRB UK diy 50 November 30th 04 11:13 PM
U NEED 2 KNOW PART P dms1.go-plus.net UK diy 42 November 24th 04 11:19 PM
Some chromoly questions The Hurdy Gurdy Man Metalworking 24 December 11th 03 05:20 AM


All times are GMT +1. The time now is 01:57 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"