Home |
Search |
Today's Posts |
|
Metalworking (rec.crafts.metalworking) Discuss various aspects of working with metal, such as machining, welding, metal joining, screwing, casting, hardening/tempering, blacksmithing/forging, spinning and hammer work, sheet metal work. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to rec.crafts.metalworking
|
|||
|
|||
3 Pumps - 1 Tank
I've got three small CNC mills I use primarily for high speed (24K RPM)
milling of aluminum. I use flood coolant with distilled water and and about 5-6% SC520. Each has its own smallish coolant tank and it works ok, but I am constantly adding water, and to lesser degree SC520. I've been playing with the idea of using the on machine tank as a sort of chip filter to reduce coolant nozzle plugging from fines, and to make coolant maintenance a little easier. I'd put a bulkhead connector in the side of the on machine coolant tank, and let it drain into a much larger tank. I'd also add a baffle to get coolant draining from the machine pan to flow into the on-machine tank at the opposite end. Then move all the coolant pumps from the on machine tank to the bigger tank. Maybe add a simple hemispherical filter screen to the inside of the bulkheads. Is it a good idea? Am I forgetting something? |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Water Storage Tank - Plumbing the Pump & Pressure Tank | Home Repair | |||
New cold water loft tank - tank connector problem | UK diy | |||
Adding external air tank to existing air compressor to give equivalent bigger tank | Woodworking | |||
Insulating Cold Water Tank (Poly Tank PT2000 24x18x19) | UK diy | |||
Central heating header tank - ground floor shut off to tank feed? | UK diy |