Default New front walkway - pricing?

I'm impressed by the thoughtful advice you guys provide in this group
and am hoping you can advise me here.
My home had a 78-year old front stoop, steps and walkway that was
shoddily done to begin with and was finally crumbling into ruins.
Viewed from the front, the steps were crooked from left to right, and
the top step in front of the stoop was way too low, causing everyone
who exited the front door to nearly break their neck on the way down.
My contractor agreed to fix this and did so, beautifully. However,
when he handed me the bill, it was almost two thousand dollars higher
than the top figure of the price range he had quoted in writing (the
price depended on the cost of the materials I chose, and the bluestone
and brick that I chose was well within the agreed-upon range). The
contractor then explained, AFTER THE FACT, that the front landing also
was not square to the front door, that he had to add six inches of
concrete to one side to make it even, add a frame to hold the
additional concrete, and that he had to do this over a period of days
to let each layer of concrete dry before adding more. In addition,
when he evened up the little stairs and the other end of the walkway,
he felt he had to add one more stair and did so, also without
discussing it with me first. (I thought the three existing steps were
fine.) At no time before or during the job did he tell me about these
problems. Had I known, I might have said no due to the additional
cost, downsized the job, or cut back on other repairs that I also was
doing at the time.
For all you contractors out there, what is the fair thing to do?
The front stoop and stairs were open, obvious, and easily measureable
all along -- this was not a case of discovering HIDDEN problems that
needed to be rectified before the job could continue. If the front
stoop was not even with the doorway and an additional step was
required, I think that he should have seen that when he first looked
at the site and then taken it into consideration when preparing a
quote for me. Even if he missed it, he should have discussed it with
me when he first became aware of it and gotten my ok to do the extra
work. Also, our town is extraordinarily strict about changes to the
exterior of the house (a fact about which I had previously informed
him) and I might have been required to file and receive approval for
this change from the town's real estate planning board first.
First, my contractor unquestionably did a superior job in the
actual construction and produced a thing of beauty. I am very happy
with the cosmetic result. However, I don't think he should help
himself to a few extra thousand dollars of my money without my express
prior approval. I carefully budgeted this repair and feel that he
should honor his original written quote because the extra charge is
due entirely to his planning mistake and, later, his lack of proper
communication. Whenever I have had other work done on the house, the
people are very careful to stop work, inform me of unanticipated
circumstances, and get my ok to possible higher charges before
continuing, a courtesy that I both expect and truly appreciate. I
often agree to go ahead. However, this huge additional bill after the
fact nearly gave me a heart attack. I really cannot afford it. Also,
is it ethical for him to present me with a bill almost 40% higher than
the top range of his written quote without having gotten my approval
for the extra work and price increase first?
Second, I now have to inform the town about it and may have to
tear it out. Not only do I NOT want to pay the extra charge, but I
feel I should subtract the cost of any additional alterations the town
may require from his bill. Do you agree, and what is your advice for
the best way to handle this?
  #2   Report Post  
Roger
 
Posts: n/a
Default


"Cindy" wrote in message
...
I'm impressed by the thoughtful advice you guys provide in this group
and am hoping you can advise me here.
My home had a 78-year old front stoop, steps and walkway that was
shoddily done to begin with and was finally crumbling into ruins.
Viewed from the front, the steps were crooked from left to right, and
the top step in front of the stoop was way too low, causing everyone
who exited the front door to nearly break their neck on the way down.
My contractor agreed to fix this and did so, beautifully. However,
when he handed me the bill, it was almost two thousand dollars higher
than the top figure of the price range he had quoted in writing (the
price depended on the cost of the materials I chose, and the bluestone
and brick that I chose was well within the agreed-upon range). The
contractor then explained, AFTER THE FACT, that the front landing also
was not square to the front door, that he had to add six inches of
concrete to one side to make it even, add a frame to hold the
additional concrete, and that he had to do this over a period of days
to let each layer of concrete dry before adding more. In addition,
when he evened up the little stairs and the other end of the walkway,
he felt he had to add one more stair and did so, also without
discussing it with me first. (I thought the three existing steps were
fine.) At no time before or during the job did he tell me about these
problems. Had I known, I might have said no due to the additional
cost, downsized the job, or cut back on other repairs that I also was
doing at the time.
For all you contractors out there, what is the fair thing to do?
The front stoop and stairs were open, obvious, and easily measureable
all along -- this was not a case of discovering HIDDEN problems that
needed to be rectified before the job could continue. If the front
stoop was not even with the doorway and an additional step was
required, I think that he should have seen that when he first looked
at the site and then taken it into consideration when preparing a
quote for me. Even if he missed it, he should have discussed it with
me when he first became aware of it and gotten my ok to do the extra
work. Also, our town is extraordinarily strict about changes to the
exterior of the house (a fact about which I had previously informed
him) and I might have been required to file and receive approval for
this change from the town's real estate planning board first.
First, my contractor unquestionably did a superior job in the
actual construction and produced a thing of beauty. I am very happy
with the cosmetic result. However, I don't think he should help
himself to a few extra thousand dollars of my money without my express
prior approval. I carefully budgeted this repair and feel that he
should honor his original written quote because the extra charge is
due entirely to his planning mistake and, later, his lack of proper
communication. Whenever I have had other work done on the house, the
people are very careful to stop work, inform me of unanticipated
circumstances, and get my ok to possible higher charges before
continuing, a courtesy that I both expect and truly appreciate. I
often agree to go ahead. However, this huge additional bill after the
fact nearly gave me a heart attack. I really cannot afford it. Also,
is it ethical for him to present me with a bill almost 40% higher than
the top range of his written quote without having gotten my approval
for the extra work and price increase first?
Second, I now have to inform the town about it and may have to
tear it out. Not only do I NOT want to pay the extra charge, but I
feel I should subtract the cost of any additional alterations the town
may require from his bill. Do you agree, and what is your advice for
the best way to handle this?


As the English would say, this is highly irregular.
I would tell him you are thrilled with the job, would like to use his
talents for future work, but since you had a formally agreed price, and no
notice of any extra work, and what work he did was not unknown at the time
of the estimate, you will pay him the agreed price. It really comes down to
whether you want him to work for you again. Once you express unwillingness
to pay *his* price, he will likely say " OK let's split the difference - 20
per cent over the estimate" . So get ready for that, and think hard about
whether you have some flexibility/willingness to pay over the written
estimate.
I'm no lawyer, but if you pay the original price, he as no legal basis for
getting a penny more, even if his view of the work was outside the scope of
the written agreement. I would completely steer clear of any arguments about
town zoning concerns for added changes, as that is ultmately your
responsibility, not his.


  #3   Report Post  
Zimmerman
 
Posts: n/a
Default

Pay the extra couple thousand, and give the man a $500 tip. It's only money


"Cindy" wrote in message
...
I'm impressed by the thoughtful advice you guys provide in this group
and am hoping you can advise me here.
My home had a 78-year old front stoop, steps and walkway that was
shoddily done to begin with and was finally crumbling into ruins.
Viewed from the front, the steps were crooked from left to right, and
the top step in front of the stoop was way too low, causing everyone
who exited the front door to nearly break their neck on the way down.
My contractor agreed to fix this and did so, beautifully. However,
when he handed me the bill, it was almost two thousand dollars higher
than the top figure of the price range he had quoted in writing (the
price depended on the cost of the materials I chose, and the bluestone
and brick that I chose was well within the agreed-upon range). The
contractor then explained, AFTER THE FACT, that the front landing also
was not square to the front door, that he had to add six inches of
concrete to one side to make it even, add a frame to hold the
additional concrete, and that he had to do this over a period of days
to let each layer of concrete dry before adding more. In addition,
when he evened up the little stairs and the other end of the walkway,
he felt he had to add one more stair and did so, also without
discussing it with me first. (I thought the three existing steps were
fine.) At no time before or during the job did he tell me about these
problems. Had I known, I might have said no due to the additional
cost, downsized the job, or cut back on other repairs that I also was
doing at the time.
For all you contractors out there, what is the fair thing to do?
The front stoop and stairs were open, obvious, and easily measureable
all along -- this was not a case of discovering HIDDEN problems that
needed to be rectified before the job could continue. If the front
stoop was not even with the doorway and an additional step was
required, I think that he should have seen that when he first looked
at the site and then taken it into consideration when preparing a
quote for me. Even if he missed it, he should have discussed it with
me when he first became aware of it and gotten my ok to do the extra
work. Also, our town is extraordinarily strict about changes to the
exterior of the house (a fact about which I had previously informed
him) and I might have been required to file and receive approval for
this change from the town's real estate planning board first.
First, my contractor unquestionably did a superior job in the
actual construction and produced a thing of beauty. I am very happy
with the cosmetic result. However, I don't think he should help
himself to a few extra thousand dollars of my money without my express
prior approval. I carefully budgeted this repair and feel that he
should honor his original written quote because the extra charge is
due entirely to his planning mistake and, later, his lack of proper
communication. Whenever I have had other work done on the house, the
people are very careful to stop work, inform me of unanticipated
circumstances, and get my ok to possible higher charges before
continuing, a courtesy that I both expect and truly appreciate. I
often agree to go ahead. However, this huge additional bill after the
fact nearly gave me a heart attack. I really cannot afford it. Also,
is it ethical for him to present me with a bill almost 40% higher than
the top range of his written quote without having gotten my approval
for the extra work and price increase first?
Second, I now have to inform the town about it and may have to
tear it out. Not only do I NOT want to pay the extra charge, but I
feel I should subtract the cost of any additional alterations the town
may require from his bill. Do you agree, and what is your advice for
the best way to handle this?


  #4   Report Post  
MAG
 
Posts: n/a
Default


First, tell him that you are concerned that additional work was done
without your consent, and that you are going to have to run it by the
town board. Express to him that while you think he did a superior job as
the end result, there is a possibility it may have to be ripped out and
redone according to town specs, so you need tim to determine the next
step.

Presuming it looks as good as you say, it's really unlikely you'll need
to have it all redone. In this case, he is entitled to the top end of
the range he quoted.

If it has to be ripped out, he is probably liable for the damages you
incur. Consult a lawyer if this comes to pass.

I'm no lawyer so I can't advise you on your rights. Common sense tells
me that failing to get consent for changes in the work scope is a bad
business practice. Tell him that you might have agreed to some
additional charges had they been discussed with you in advance, so you
could plan for them, but in the end you have a written contract and no
change orders for him to use.

Marc
  #5   Report Post  
Chet Hayes
 
Posts: n/a
Default

MAG wrote in message iganews.com...
First, tell him that you are concerned that additional work was done
without your consent, and that you are going to have to run it by the
town board. Express to him that while you think he did a superior job as
the end result, there is a possibility it may have to be ripped out and
redone according to town specs, so you need tim to determine the next
step.

Presuming it looks as good as you say, it's really unlikely you'll need
to have it all redone. In this case, he is entitled to the top end of
the range he quoted.

If it has to be ripped out, he is probably liable for the damages you
incur. Consult a lawyer if this comes to pass.

I'm no lawyer so I can't advise you on your rights. Common sense tells
me that failing to get consent for changes in the work scope is a bad
business practice. Tell him that you might have agreed to some
additional charges had they been discussed with you in advance, so you
could plan for them, but in the end you have a written contract and no
change orders for him to use.

Marc



One can only wonder where the owner was when this was all being done.
I can see how some extra concrete pours could not be obvious, but
surely adding another step had to be.

At this point, I surely wouldn't go running to any regulatory
authority for retroactive approval of changes. Your position should
be you just did repairs, end of story. Unless it's something very
obvious and that someone would object to, it's unlikely to bring any
attention. On the other hand, if you point it out, you do run the
risk of them making you redo the whole thing. And if that happens,
it's going to be at your expense, so I don't see the advantage to
looking for trouble before it finds you.

With the contractor, a lot depends on what the quote says. If it
clearly states a max price and accurately describes what was to be
done, then I would tell the contractor that is all you think you
should pay. Since he did a great job, at that point, you could
negotiate and pay him a few hundred more perhaps, but not the full
$2K. As long as you haven't paid him, you're in a good position. The
worst he could do is sue you in small claims court.
Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Converting a Real stucco with stacked stone to a brick front raiden Home Repair 7 March 2nd 04 05:06 AM
Fridge freezer - how to remove top front panel (Bosch KGV3120GB/04 UK model) Joe UK diy 2 October 22nd 03 12:31 PM
Front Loading Washers Kevin O' Home Repair 25 August 31st 03 11:07 PM


All times are GMT +1. The time now is 08:38 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"