Default Reinforcing concrete slab with dowels

I have a trench about 4; wide and 10' long in my slab that was opened up for
plumbing drain relocation and now I am ready to close it up. I will put the
sand back in and compact it real well, then termicide, then moisture
barrier, then I plan to add dowels to both sides of the existing slab and
pour new concrete.

It is very difficult to do the dowels because the trench width it irregular.
As I did the first two I started to think if I position the dowels
differently would it make the job easier and actually more effective?

Instead of drilling holes on existing edges, why put the end of the dowel at
the bottom of one slab, then pound it deep into the sand as far as it will
go at an incline, when the dowel is shortened to be about the same width as
the trench, start pounding it down until it wedges into the existing
concrete on the other side. So basically the dowel will bridge the trench
from below one slab to the middle of another slab, sort of pushing up the
existing slab.

If I continue this pattern, alternating the dowels say every 16 inches, I
will have an even number of dowels on each side, angled up. If I pour
concrete in and embed it into the new concrete, would it not be like
pretensioning it? Seems to me logically would hold the new concrete up
better...or am I nutz?

MC


  #2   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 256
Default Reinforcing concrete slab with dowels

MiamiCuse wrote:

I have a trench about 4; wide and 10' long in my slab that was opened up for
plumbing drain relocation and now I am ready to close it up. I will put the
sand back in and compact it real well, then termicide, then moisture
barrier, then I plan to add dowels to both sides of the existing slab and
pour new concrete.

It is very difficult to do the dowels because the trench width it irregular.
As I did the first two I started to think if I position the dowels
differently would it make the job easier and actually more effective?

Instead of drilling holes on existing edges, why put the end of the dowel at
the bottom of one slab, then pound it deep into the sand as far as it will
go at an incline, when the dowel is shortened to be about the same width as
the trench, start pounding it down until it wedges into the existing
concrete on the other side. So basically the dowel will bridge the trench
from below one slab to the middle of another slab, sort of pushing up the
existing slab.

If I continue this pattern, alternating the dowels say every 16 inches, I
will have an even number of dowels on each side, angled up. If I pour
concrete in and embed it into the new concrete, would it not be like
pretensioning it? Seems to me logically would hold the new concrete up
better...or am I nutz?

MC


No. Bad idea. The rebar is supposed to be protected from
exposure to earth or even air, because the most common problem
for rebar is failure due to rust. Embedding the rebar in the
dirt will drastically accelerate its deterioration due to
oxidation (rust). Your rebar should be no closer than 2" to the
dirt (or at the center of the slab, vertically).

In addition, the rebar in this instance is not to strengthen the
concrete, but to tie the old concrete to the new. This is to
keep the new and the old from settling differently. You want
both to act as a unit, therefore the dowels.

To make the job easier, instead of trying to drill straight into
the concrete, drill at a 45 degree or less angle (on the
horizontal axis) . Then install your rebar and bend it straight.
This allows you to get your hammer drill into tighter spaces.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX
  #3   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 929
Default Reinforcing concrete slab with dowels

On Feb 16, 9:09 pm, Robert Allison wrote:
MiamiCuse wrote:
I have a trench about 4; wide and 10' long in my slab that was opened up for
plumbing drain relocation and now I am ready to close it up. I will put the
sand back in and compact it real well, then termicide, then moisture
barrier, then I plan to add dowels to both sides of the existing slab and
pour new concrete.


It is very difficult to do the dowels because the trench width it irregular.
As I did the first two I started to think if I position the dowels
differently would it make the job easier and actually more effective?


Instead of drilling holes on existing edges, why put the end of the dowel at
the bottom of one slab, then pound it deep into the sand as far as it will
go at an incline, when the dowel is shortened to be about the same width as
the trench, start pounding it down until it wedges into the existing
concrete on the other side. So basically the dowel will bridge the trench
from below one slab to the middle of another slab, sort of pushing up the
existing slab.


If I continue this pattern, alternating the dowels say every 16 inches, I
will have an even number of dowels on each side, angled up. If I pour
concrete in and embed it into the new concrete, would it not be like
pretensioning it? Seems to me logically would hold the new concrete up
better...or am I nutz?


MC


No. Bad idea. The rebar is supposed to be protected from
exposure to earth or even air, because the most common problem
for rebar is failure due to rust. Embedding the rebar in the
dirt will drastically accelerate its deterioration due to
oxidation (rust). Your rebar should be no closer than 2" to the
dirt (or at the center of the slab, vertically).

In addition, the rebar in this instance is not to strengthen the
concrete, but to tie the old concrete to the new. This is to
keep the new and the old from settling differently. You want
both to act as a unit, therefore the dowels.

To make the job easier, instead of trying to drill straight into
the concrete, drill at a 45 degree or less angle (on the
horizontal axis) . Then install your rebar and bend it straight.
This allows you to get your hammer drill into tighter spaces.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX


MC-

Robert hit all the important points....follow his advice & your slab
will easily outlast you.

Don't & the slab will fail in a few years.

A variable speed rotary hammer will make drilling easier.

cheers
Bob
  #4   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 664
Default Reinforcing concrete slab with dowels


wrote in message
...
On Sat, 16 Feb 2008 23:15:08 -0500, "MiamiCuse"
wrote:

I have a trench about 4; wide and 10' long in my slab that was opened up
for
plumbing drain relocation and now I am ready to close it up. I will put
the
sand back in and compact it real well, then termicide, then moisture
barrier, then I plan to add dowels to both sides of the existing slab and
pour new concrete.

It is very difficult to do the dowels because the trench width it
irregular.
As I did the first two I started to think if I position the dowels
differently would it make the job easier and actually more effective?

Instead of drilling holes on existing edges, why put the end of the dowel
at
the bottom of one slab, then pound it deep into the sand as far as it will
go at an incline, when the dowel is shortened to be about the same width
as
the trench, start pounding it down until it wedges into the existing
concrete on the other side. So basically the dowel will bridge the trench
from below one slab to the middle of another slab, sort of pushing up the
existing slab.

If I continue this pattern, alternating the dowels say every 16 inches, I
will have an even number of dowels on each side, angled up. If I pour
concrete in and embed it into the new concrete, would it not be like
pretensioning it? Seems to me logically would hold the new concrete up
better...or am I nutz?

MC



I think you are working too hard on this. Compact the dirt and pour in
the patch using an acrylic patch mix that will bond to the old slab
and be done with it. Use a low slump on the concrete and it won't
shrink as much (less water) What kind of surface are you installing
over this?


Ceramic tiles, a preslope for shower pan, more mortar on top of it and more
tiles. Thanks.


  #5   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 664
Default Reinforcing concrete slab with dowels


"Robert Allison" wrote in message
news:fkPtj.36007$we5.12736@trnddc02...
MiamiCuse wrote:

I have a trench about 4; wide and 10' long in my slab that was opened up
for plumbing drain relocation and now I am ready to close it up. I will
put the sand back in and compact it real well, then termicide, then
moisture barrier, then I plan to add dowels to both sides of the existing
slab and pour new concrete.

It is very difficult to do the dowels because the trench width it
irregular. As I did the first two I started to think if I position the
dowels differently would it make the job easier and actually more
effective?

Instead of drilling holes on existing edges, why put the end of the dowel
at the bottom of one slab, then pound it deep into the sand as far as it
will go at an incline, when the dowel is shortened to be about the same
width as the trench, start pounding it down until it wedges into the
existing concrete on the other side. So basically the dowel will bridge
the trench from below one slab to the middle of another slab, sort of
pushing up the existing slab.

If I continue this pattern, alternating the dowels say every 16 inches, I
will have an even number of dowels on each side, angled up. If I pour
concrete in and embed it into the new concrete, would it not be like
pretensioning it? Seems to me logically would hold the new concrete up
better...or am I nutz?

MC


No. Bad idea. The rebar is supposed to be protected from exposure to
earth or even air, because the most common problem for rebar is failure
due to rust. Embedding the rebar in the dirt will drastically accelerate
its deterioration due to oxidation (rust). Your rebar should be no closer
than 2" to the dirt (or at the center of the slab, vertically).

In addition, the rebar in this instance is not to strengthen the concrete,
but to tie the old concrete to the new. This is to keep the new and the
old from settling differently. You want both to act as a unit, therefore
the dowels.

To make the job easier, instead of trying to drill straight into the
concrete, drill at a 45 degree or less angle (on the horizontal axis) .
Then install your rebar and bend it straight. This allows you to get your
hammer drill into tighter spaces.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX


Thanks Robert did not think about that...ok

although I think they will rust anyways. The original slab I broke has wire
meshes in the concrete and they were all rusted, the cast iron drain below
that I replaced has exterior corrosion. The water table in Miami is very
high.

Install the rebars eccentrically and bent it straight? What size rebar?

MC




  #6   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 664
Default Reinforcing concrete slab with dowels


"BobK207" wrote in message
...
On Feb 16, 9:09 pm, Robert Allison wrote:
MiamiCuse wrote:
I have a trench about 4; wide and 10' long in my slab that was opened
up for
plumbing drain relocation and now I am ready to close it up. I will
put the
sand back in and compact it real well, then termicide, then moisture
barrier, then I plan to add dowels to both sides of the existing slab
and
pour new concrete.


It is very difficult to do the dowels because the trench width it
irregular.
As I did the first two I started to think if I position the dowels
differently would it make the job easier and actually more effective?


Instead of drilling holes on existing edges, why put the end of the
dowel at
the bottom of one slab, then pound it deep into the sand as far as it
will
go at an incline, when the dowel is shortened to be about the same
width as
the trench, start pounding it down until it wedges into the existing
concrete on the other side. So basically the dowel will bridge the
trench
from below one slab to the middle of another slab, sort of pushing up
the
existing slab.


If I continue this pattern, alternating the dowels say every 16 inches,
I
will have an even number of dowels on each side, angled up. If I pour
concrete in and embed it into the new concrete, would it not be like
pretensioning it? Seems to me logically would hold the new concrete up
better...or am I nutz?


MC


No. Bad idea. The rebar is supposed to be protected from
exposure to earth or even air, because the most common problem
for rebar is failure due to rust. Embedding the rebar in the
dirt will drastically accelerate its deterioration due to
oxidation (rust). Your rebar should be no closer than 2" to the
dirt (or at the center of the slab, vertically).

In addition, the rebar in this instance is not to strengthen the
concrete, but to tie the old concrete to the new. This is to
keep the new and the old from settling differently. You want
both to act as a unit, therefore the dowels.

To make the job easier, instead of trying to drill straight into
the concrete, drill at a 45 degree or less angle (on the
horizontal axis) . Then install your rebar and bend it straight.
This allows you to get your hammer drill into tighter spaces.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX


MC-

Robert hit all the important points....follow his advice & your slab
will easily outlast you.

Don't & the slab will fail in a few years.

A variable speed rotary hammer will make drilling easier.

cheers
Bob


Thanks Bob! Again!

well part of the reason I was having that wild idea (bad idea) is because as
I sat in the trench drilling I realized the "existing slab" I am drilling
into on the opposing end is along an exterior wall. Here is a picture of
the trench:

http://i173.photobucket.com/albums/w...g?t=1203265107

The PVC drain is 4" in diameter so the trench is about 3' wide and a bit
more in some areas. To the right there you can see the supply line to the
toilet and that is where the exterior wall is. See where the PVC pipe from
"north" of the toilet drain goes near the wall and underneath? Well the
plumber had that section of the pipe tucked along the length of the wall
until it gets to the lav, which means the underside of the slab along half
the trench has been disturbed, moved, dig around...the slab is just
"hanging" out there, I am not sure how strong that is. It's only 10" side
until it hits the 8" concrete wall. Can that 10" of hanging slab with
nothing underneath (I will pack sand back in sideways) be strong enough to
"tie into" and hold the 4' wide new concrete I will be pouring?

I don't know. I am just not comfortable what I am looking at, may be I am
overanalyzing, but in retrospect I should have limited what the plumbers
torn up, but that's too late now.




  #7   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 664
Default Reinforcing concrete slab with dowels


wrote in message
...
On Sun, 17 Feb 2008 11:08:30 -0500, "MiamiCuse"
wrote:


wrote in message
. ..
What kind of surface are you installing
over this?


Ceramic tiles, a preslope for shower pan, more mortar on top of it and
more
tiles. Thanks.


Typically they will lay tile over a membrane down here. Concrete will
crack and transfer the crack through the tile otherwise.


I have not seen membrane under tiles in the places I lived and visited.
Seems they just apply thinset and tile on. Wood floors or laminated floor a
moisture barrier is common. There is a layer of moisture barrier on the
underside of the slab which I torn up when digging up the trench. I will
need to fix that back in. Thanks.


  #8   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 190
Default Reinforcing concrete slab with dowels

You may want to conside using this or a similar product.

http://www.schluter.com/6_1_ditra.aspx
"MiamiCuse" wrote in message
...

wrote in message
...
On Sun, 17 Feb 2008 11:08:30 -0500, "MiamiCuse"
wrote:


wrote in message
...
What kind of surface are you installing
over this?

Ceramic tiles, a preslope for shower pan, more mortar on top of it and
more
tiles. Thanks.


Typically they will lay tile over a membrane down here. Concrete will
crack and transfer the crack through the tile otherwise.


I have not seen membrane under tiles in the places I lived and visited.
Seems they just apply thinset and tile on. Wood floors or laminated floor
a moisture barrier is common. There is a layer of moisture barrier on the
underside of the slab which I torn up when digging up the trench. I will
need to fix that back in. Thanks.



  #9   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 256
Default Reinforcing concrete slab with dowels

MiamiCuse wrote:

Thanks Robert did not think about that...ok

although I think they will rust anyways. The original slab I broke has wire
meshes in the concrete and they were all rusted, the cast iron drain below
that I replaced has exterior corrosion. The water table in Miami is very
high.

Install the rebars eccentrically and bent it straight? What size rebar?

MC


OK, this is a response to both your reply to Bob above, and to
this message. I have looked at the photo that you provided and
here are my recommendations;

You have enough room to drill rebar dowels straight into the
existing concrete, so do that. It is best if they are straight
and in the middle of the slab vertically. (I was picturing a
much narrower trench, where it would be difficult to get the
drill straight.)

Use #4 (1/2") rebar. Drill 1/2" holes and drive the dowels about
4-6" into the existing concrete. You could do this on 2' centers
along both sides of the trench, probably just two in the ends
(the short sides of your trench). Tie these together to form the
standard grid pattern. I usually install a short piece of rebar
in one side, and a long one in the other, then just tie the two
together with tie wire. I try to lap the two pieces by about 12
inches.

Don't shove sand up under the overhanging edges. It will compact
sideways, but not vertically (which is what you want). Instead,
mix up some slurry and pour it under there. You can make slurry
out of a very wet mix of standard premix, but I usually spend the
extra money and use a wet mix of non shrink grout. The
deleterious effects of the added water in the mix is minimized by
the extra strength of the grout. Pour this in so that it runs
under the existing concrete and fill it up to the BOTTOM of the
existing concrete. Let this set up, then pour your concrete over
this. You can use the sand to dam up the edge so you don't have
to use much of this slurry, just along the overhanging edges.

In addition, you could use a higher strength concrete, mix it
wet, and vibrate it under the existing slab. I don't like adding
water to concrete, so I would recommend the previous method.
Makes for a stronger concrete end product.

Last, but not least, use your concrete blade in your grinder to
get a straight vertical edge along the sides of the trench. Some
of the edges are straight enough, but you do NOT want concrete
feathered like it would be if you poured it like it is right now.

The best way to achieve straight edges is to cut the concrete to
about half its thickness with a masonry blade in either a
circular saw, or a grinder, then break off the remainder. You
want a fairly straight vertical edge on the existing concrete,
but it does not need to be perfect. You do not want your new
concrete to be less than 2" thick, ANYWHERE. I am not talking
about the sum of the new and the old, I am talking about just the
new portion that you are placing. If it feathers to nothing over
the existing concrete, it will not have the strength it needs to
maintain its integrity.

Seems like a lot here, but it really isn't.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX
  #10   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 327
Default Reinforcing concrete slab with dowels

On Sun, 17 Feb 2008 11:26:06 -0500, MiamiCuse wrote:

"BobK207" wrote in message
...
On Feb 16, 9:09 pm, Robert Allison wrote:
MiamiCuse wrote:
I have a trench about 4; wide and 10' long in my slab that was opened
up for
plumbing drain relocation and now I am ready to close it up. I will
put the
sand back in and compact it real well, then termicide, then moisture
barrier, then I plan to add dowels to both sides of the existing slab
and
pour new concrete.

It is very difficult to do the dowels because the trench width it
irregular.
As I did the first two I started to think if I position the dowels
differently would it make the job easier and actually more effective?

Instead of drilling holes on existing edges, why put the end of the
dowel at
the bottom of one slab, then pound it deep into the sand as far as it
will
go at an incline, when the dowel is shortened to be about the same
width as
the trench, start pounding it down until it wedges into the existing
concrete on the other side. So basically the dowel will bridge the
trench
from below one slab to the middle of another slab, sort of pushing up
the
existing slab.

If I continue this pattern, alternating the dowels say every 16 inches,
I
will have an even number of dowels on each side, angled up. If I pour
concrete in and embed it into the new concrete, would it not be like
pretensioning it? Seems to me logically would hold the new concrete up
better...or am I nutz?

MC

No. Bad idea. The rebar is supposed to be protected from
exposure to earth or even air, because the most common problem
for rebar is failure due to rust. Embedding the rebar in the
dirt will drastically accelerate its deterioration due to
oxidation (rust). Your rebar should be no closer than 2" to the
dirt (or at the center of the slab, vertically).

In addition, the rebar in this instance is not to strengthen the
concrete, but to tie the old concrete to the new. This is to
keep the new and the old from settling differently. You want
both to act as a unit, therefore the dowels.

To make the job easier, instead of trying to drill straight into
the concrete, drill at a 45 degree or less angle (on the
horizontal axis) . Then install your rebar and bend it straight.
This allows you to get your hammer drill into tighter spaces.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX


MC-

Robert hit all the important points....follow his advice & your slab
will easily outlast you.

Don't & the slab will fail in a few years.

A variable speed rotary hammer will make drilling easier.

cheers
Bob


Thanks Bob! Again!

well part of the reason I was having that wild idea (bad idea) is because as
I sat in the trench drilling I realized the "existing slab" I am drilling
into on the opposing end is along an exterior wall. Here is a picture of
the trench:

http://i173.photobucket.com/albums/w...g?t=1203265107

The PVC drain is 4" in diameter so the trench is about 3' wide and a bit
more in some areas. To the right there you can see the supply line to the
toilet and that is where the exterior wall is. See where the PVC pipe from
"north" of the toilet drain goes near the wall and underneath? Well the
plumber had that section of the pipe tucked along the length of the wall
until it gets to the lav, which means the underside of the slab along half
the trench has been disturbed, moved, dig around...the slab is just
"hanging" out there, I am not sure how strong that is. It's only 10" side
until it hits the 8" concrete wall. Can that 10" of hanging slab with
nothing underneath (I will pack sand back in sideways) be strong enough to
"tie into" and hold the 4' wide new concrete I will be pouring?

I don't know. I am just not comfortable what I am looking at, may be I am
overanalyzing, but in retrospect I should have limited what the plumbers
torn up, but that's too late now.



Do NOT run the rebar all the way from one side to the other. The rebar
needed to tie into the existing slab should be no longer than about 8-12"
total, half in the old and half in the new. You can run the rebar the rest
of the new work, but don't tie it into the stubs from the existing slab.


  #11   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 256
Default Reinforcing concrete slab with dowels

Mike Dobony wrote:

On Sun, 17 Feb 2008 11:26:06 -0500, MiamiCuse wrote:


"BobK207" wrote in message
...

On Feb 16, 9:09 pm, Robert Allison wrote:

MiamiCuse wrote:

I have a trench about 4; wide and 10' long in my slab that was opened
up for
plumbing drain relocation and now I am ready to close it up. I will
put the
sand back in and compact it real well, then termicide, then moisture
barrier, then I plan to add dowels to both sides of the existing slab
and
pour new concrete.

It is very difficult to do the dowels because the trench width it
irregular.
As I did the first two I started to think if I position the dowels
differently would it make the job easier and actually more effective?

Instead of drilling holes on existing edges, why put the end of the
dowel at
the bottom of one slab, then pound it deep into the sand as far as it
will
go at an incline, when the dowel is shortened to be about the same
width as
the trench, start pounding it down until it wedges into the existing
concrete on the other side. So basically the dowel will bridge the
trench
from below one slab to the middle of another slab, sort of pushing up
the
existing slab.

If I continue this pattern, alternating the dowels say every 16 inches,
I
will have an even number of dowels on each side, angled up. If I pour
concrete in and embed it into the new concrete, would it not be like
pretensioning it? Seems to me logically would hold the new concrete up
better...or am I nutz?

MC

No. Bad idea. The rebar is supposed to be protected from
exposure to earth or even air, because the most common problem
for rebar is failure due to rust. Embedding the rebar in the
dirt will drastically accelerate its deterioration due to
oxidation (rust). Your rebar should be no closer than 2" to the
dirt (or at the center of the slab, vertically).

In addition, the rebar in this instance is not to strengthen the
concrete, but to tie the old concrete to the new. This is to
keep the new and the old from settling differently. You want
both to act as a unit, therefore the dowels.

To make the job easier, instead of trying to drill straight into
the concrete, drill at a 45 degree or less angle (on the
horizontal axis) . Then install your rebar and bend it straight.
This allows you to get your hammer drill into tighter spaces.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX

MC-

Robert hit all the important points....follow his advice & your slab
will easily outlast you.

Don't & the slab will fail in a few years.

A variable speed rotary hammer will make drilling easier.

cheers
Bob


Thanks Bob! Again!

well part of the reason I was having that wild idea (bad idea) is because as
I sat in the trench drilling I realized the "existing slab" I am drilling
into on the opposing end is along an exterior wall. Here is a picture of
the trench:

http://i173.photobucket.com/albums/w...g?t=1203265107

The PVC drain is 4" in diameter so the trench is about 3' wide and a bit
more in some areas. To the right there you can see the supply line to the
toilet and that is where the exterior wall is. See where the PVC pipe from
"north" of the toilet drain goes near the wall and underneath? Well the
plumber had that section of the pipe tucked along the length of the wall
until it gets to the lav, which means the underside of the slab along half
the trench has been disturbed, moved, dig around...the slab is just
"hanging" out there, I am not sure how strong that is. It's only 10" side
until it hits the 8" concrete wall. Can that 10" of hanging slab with
nothing underneath (I will pack sand back in sideways) be strong enough to
"tie into" and hold the 4' wide new concrete I will be pouring?

I don't know. I am just not comfortable what I am looking at, may be I am
overanalyzing, but in retrospect I should have limited what the plumbers
torn up, but that's too late now.




Do NOT run the rebar all the way from one side to the other. The rebar
needed to tie into the existing slab should be no longer than about 8-12"
total, half in the old and half in the new. You can run the rebar the rest
of the new work, but don't tie it into the stubs from the existing slab.


Why not?

--
Robert Allison
Rimshot, Inc.
Georgetown, TX
  #13   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 664
Default Reinforcing concrete slab with dowels


"Robert Allison" wrote in message
newso%tj.4388$kD3.611@trnddc08...
MiamiCuse wrote:

Thanks Robert did not think about that...ok

although I think they will rust anyways. The original slab I broke has
wire meshes in the concrete and they were all rusted, the cast iron drain
below that I replaced has exterior corrosion. The water table in Miami
is very high.

Install the rebars eccentrically and bent it straight? What size rebar?

MC


OK, this is a response to both your reply to Bob above, and to this
message. I have looked at the photo that you provided and here are my
recommendations;

You have enough room to drill rebar dowels straight into the existing
concrete, so do that. It is best if they are straight and in the middle
of the slab vertically. (I was picturing a much narrower trench, where it
would be difficult to get the drill straight.)

Use #4 (1/2") rebar. Drill 1/2" holes and drive the dowels about 4-6"
into the existing concrete. You could do this on 2' centers along both
sides of the trench, probably just two in the ends (the short sides of
your trench). Tie these together to form the standard grid pattern. I
usually install a short piece of rebar in one side, and a long one in the
other, then just tie the two together with tie wire. I try to lap the
two pieces by about 12 inches.

Don't shove sand up under the overhanging edges. It will compact
sideways, but not vertically (which is what you want). Instead, mix up
some slurry and pour it under there. You can make slurry out of a very
wet mix of standard premix, but I usually spend the extra money and use a
wet mix of non shrink grout. The deleterious effects of the added water
in the mix is minimized by the extra strength of the grout. Pour this in
so that it runs under the existing concrete and fill it up to the BOTTOM
of the existing concrete. Let this set up, then pour your concrete over
this. You can use the sand to dam up the edge so you don't have to use
much of this slurry, just along the overhanging edges.

In addition, you could use a higher strength concrete, mix it wet, and
vibrate it under the existing slab. I don't like adding water to
concrete, so I would recommend the previous method. Makes for a stronger
concrete end product.

Last, but not least, use your concrete blade in your grinder to get a
straight vertical edge along the sides of the trench. Some of the edges
are straight enough, but you do NOT want concrete feathered like it would
be if you poured it like it is right now.

The best way to achieve straight edges is to cut the concrete to about
half its thickness with a masonry blade in either a circular saw, or a
grinder, then break off the remainder. You want a fairly straight
vertical edge on the existing concrete, but it does not need to be
perfect. You do not want your new concrete to be less than 2" thick,
ANYWHERE. I am not talking about the sum of the new and the old, I am
talking about just the new portion that you are placing. If it feathers
to nothing over the existing concrete, it will not have the strength it
needs to maintain its integrity.

Seems like a lot here, but it really isn't.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX


Thanks Robert for all the advise. I have just one more questions.

This is another bathroom I need to pour concrete on. This trench is
smaller, where the widest part is about 3 feet and the narrow part 18".

The problem is the trench ends at the exterior wall B.

So in this case if I add dowels do I drill it into the wall?

Thanks again,

MC



  #14   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 664
Default Reinforcing concrete slab with dowels


"MiamiCuse" wrote in message
...

"Robert Allison" wrote in message
newso%tj.4388$kD3.611@trnddc08...
MiamiCuse wrote:

Thanks Robert did not think about that...ok

although I think they will rust anyways. The original slab I broke has
wire meshes in the concrete and they were all rusted, the cast iron
drain below that I replaced has exterior corrosion. The water table in
Miami is very high.

Install the rebars eccentrically and bent it straight? What size rebar?

MC


OK, this is a response to both your reply to Bob above, and to this
message. I have looked at the photo that you provided and here are my
recommendations;

You have enough room to drill rebar dowels straight into the existing
concrete, so do that. It is best if they are straight and in the middle
of the slab vertically. (I was picturing a much narrower trench, where
it would be difficult to get the drill straight.)

Use #4 (1/2") rebar. Drill 1/2" holes and drive the dowels about 4-6"
into the existing concrete. You could do this on 2' centers along both
sides of the trench, probably just two in the ends (the short sides of
your trench). Tie these together to form the standard grid pattern. I
usually install a short piece of rebar in one side, and a long one in the
other, then just tie the two together with tie wire. I try to lap the
two pieces by about 12 inches.

Don't shove sand up under the overhanging edges. It will compact
sideways, but not vertically (which is what you want). Instead, mix up
some slurry and pour it under there. You can make slurry out of a very
wet mix of standard premix, but I usually spend the extra money and use a
wet mix of non shrink grout. The deleterious effects of the added water
in the mix is minimized by the extra strength of the grout. Pour this in
so that it runs under the existing concrete and fill it up to the BOTTOM
of the existing concrete. Let this set up, then pour your concrete over
this. You can use the sand to dam up the edge so you don't have to use
much of this slurry, just along the overhanging edges.

In addition, you could use a higher strength concrete, mix it wet, and
vibrate it under the existing slab. I don't like adding water to
concrete, so I would recommend the previous method. Makes for a stronger
concrete end product.

Last, but not least, use your concrete blade in your grinder to get a
straight vertical edge along the sides of the trench. Some of the edges
are straight enough, but you do NOT want concrete feathered like it would
be if you poured it like it is right now.

The best way to achieve straight edges is to cut the concrete to about
half its thickness with a masonry blade in either a circular saw, or a
grinder, then break off the remainder. You want a fairly straight
vertical edge on the existing concrete, but it does not need to be
perfect. You do not want your new concrete to be less than 2" thick,
ANYWHERE. I am not talking about the sum of the new and the old, I am
talking about just the new portion that you are placing. If it feathers
to nothing over the existing concrete, it will not have the strength it
needs to maintain its integrity.

Seems like a lot here, but it really isn't.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX


Thanks Robert for all the advise. I have just one more questions.

This is another bathroom I need to pour concrete on. This trench is
smaller, where the widest part is about 3 feet and the narrow part 18".

The problem is the trench ends at the exterior wall B.

So in this case if I add dowels do I drill it into the wall?

Thanks again,

MC

oops forgot to attach an image link:

http://i173.photobucket.com/albums/w...8annotated.jpg



  #15   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 256
Default Reinforcing concrete slab with dowels

MiamiCuse wrote:

"MiamiCuse" wrote in message
...

"Robert Allison" wrote in message
newso%tj.4388$kD3.611@trnddc08...

MiamiCuse wrote:


Thanks Robert did not think about that...ok

although I think they will rust anyways. The original slab I broke has
wire meshes in the concrete and they were all rusted, the cast iron
drain below that I replaced has exterior corrosion. The water table in
Miami is very high.

Install the rebars eccentrically and bent it straight? What size rebar?

MC

OK, this is a response to both your reply to Bob above, and to this
message. I have looked at the photo that you provided and here are my
recommendations;

You have enough room to drill rebar dowels straight into the existing
concrete, so do that. It is best if they are straight and in the middle
of the slab vertically. (I was picturing a much narrower trench, where
it would be difficult to get the drill straight.)

Use #4 (1/2") rebar. Drill 1/2" holes and drive the dowels about 4-6"
into the existing concrete. You could do this on 2' centers along both
sides of the trench, probably just two in the ends (the short sides of
your trench). Tie these together to form the standard grid pattern. I
usually install a short piece of rebar in one side, and a long one in the
other, then just tie the two together with tie wire. I try to lap the
two pieces by about 12 inches.

Don't shove sand up under the overhanging edges. It will compact
sideways, but not vertically (which is what you want). Instead, mix up
some slurry and pour it under there. You can make slurry out of a very
wet mix of standard premix, but I usually spend the extra money and use a
wet mix of non shrink grout. The deleterious effects of the added water
in the mix is minimized by the extra strength of the grout. Pour this in
so that it runs under the existing concrete and fill it up to the BOTTOM
of the existing concrete. Let this set up, then pour your concrete over
this. You can use the sand to dam up the edge so you don't have to use
much of this slurry, just along the overhanging edges.

In addition, you could use a higher strength concrete, mix it wet, and
vibrate it under the existing slab. I don't like adding water to
concrete, so I would recommend the previous method. Makes for a stronger
concrete end product.

Last, but not least, use your concrete blade in your grinder to get a
straight vertical edge along the sides of the trench. Some of the edges
are straight enough, but you do NOT want concrete feathered like it would
be if you poured it like it is right now.

The best way to achieve straight edges is to cut the concrete to about
half its thickness with a masonry blade in either a circular saw, or a
grinder, then break off the remainder. You want a fairly straight
vertical edge on the existing concrete, but it does not need to be
perfect. You do not want your new concrete to be less than 2" thick,
ANYWHERE. I am not talking about the sum of the new and the old, I am
talking about just the new portion that you are placing. If it feathers
to nothing over the existing concrete, it will not have the strength it
needs to maintain its integrity.

Seems like a lot here, but it really isn't.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX


Thanks Robert for all the advise. I have just one more questions.

This is another bathroom I need to pour concrete on. This trench is
smaller, where the widest part is about 3 feet and the narrow part 18".

The problem is the trench ends at the exterior wall B.

So in this case if I add dowels do I drill it into the wall?

Thanks again,

MC


oops forgot to attach an image link:

http://i173.photobucket.com/albums/w...8annotated.jpg


I can't tell from that photo, but if the slab is tied into the
wall, then I would also dowel the new patch as well. If they are
separate entities, leave them that way.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX


  #16   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 327
Default Reinforcing concrete slab with dowels

On Mon, 18 Feb 2008 00:32:10 GMT, Robert Allison wrote:

Mike Dobony wrote:

On Sun, 17 Feb 2008 11:26:06 -0500, MiamiCuse wrote:


"BobK207" wrote in message
...

On Feb 16, 9:09 pm, Robert Allison wrote:

MiamiCuse wrote:

I have a trench about 4; wide and 10' long in my slab that was opened
up for
plumbing drain relocation and now I am ready to close it up. I will
put the
sand back in and compact it real well, then termicide, then moisture
barrier, then I plan to add dowels to both sides of the existing slab
and
pour new concrete.

It is very difficult to do the dowels because the trench width it
irregular.
As I did the first two I started to think if I position the dowels
differently would it make the job easier and actually more effective?

Instead of drilling holes on existing edges, why put the end of the
dowel at
the bottom of one slab, then pound it deep into the sand as far as it
will
go at an incline, when the dowel is shortened to be about the same
width as
the trench, start pounding it down until it wedges into the existing
concrete on the other side. So basically the dowel will bridge the
trench
from below one slab to the middle of another slab, sort of pushing up
the
existing slab.

If I continue this pattern, alternating the dowels say every 16 inches,
I
will have an even number of dowels on each side, angled up. If I pour
concrete in and embed it into the new concrete, would it not be like
pretensioning it? Seems to me logically would hold the new concrete up
better...or am I nutz?

MC

No. Bad idea. The rebar is supposed to be protected from
exposure to earth or even air, because the most common problem
for rebar is failure due to rust. Embedding the rebar in the
dirt will drastically accelerate its deterioration due to
oxidation (rust). Your rebar should be no closer than 2" to the
dirt (or at the center of the slab, vertically).

In addition, the rebar in this instance is not to strengthen the
concrete, but to tie the old concrete to the new. This is to
keep the new and the old from settling differently. You want
both to act as a unit, therefore the dowels.

To make the job easier, instead of trying to drill straight into
the concrete, drill at a 45 degree or less angle (on the
horizontal axis) . Then install your rebar and bend it straight.
This allows you to get your hammer drill into tighter spaces.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX

MC-

Robert hit all the important points....follow his advice & your slab
will easily outlast you.

Don't & the slab will fail in a few years.

A variable speed rotary hammer will make drilling easier.

cheers
Bob

Thanks Bob! Again!

well part of the reason I was having that wild idea (bad idea) is because as
I sat in the trench drilling I realized the "existing slab" I am drilling
into on the opposing end is along an exterior wall. Here is a picture of
the trench:

http://i173.photobucket.com/albums/w...g?t=1203265107

The PVC drain is 4" in diameter so the trench is about 3' wide and a bit
more in some areas. To the right there you can see the supply line to the
toilet and that is where the exterior wall is. See where the PVC pipe from
"north" of the toilet drain goes near the wall and underneath? Well the
plumber had that section of the pipe tucked along the length of the wall
until it gets to the lav, which means the underside of the slab along half
the trench has been disturbed, moved, dig around...the slab is just
"hanging" out there, I am not sure how strong that is. It's only 10" side
until it hits the 8" concrete wall. Can that 10" of hanging slab with
nothing underneath (I will pack sand back in sideways) be strong enough to
"tie into" and hold the 4' wide new concrete I will be pouring?

I don't know. I am just not comfortable what I am looking at, may be I am
overanalyzing, but in retrospect I should have limited what the plumbers
torn up, but that's too late now.




Do NOT run the rebar all the way from one side to the other. The rebar
needed to tie into the existing slab should be no longer than about 8-12"
total, half in the old and half in the new. You can run the rebar the rest
of the new work, but don't tie it into the stubs from the existing slab.


Why not?



It has something to do with expansion. My brother in law did commercial
construction for a number of years and concrete work was central in a lot
of it. When he was helping me with repairs he taught me this one.
  #17   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 929
Default Reinforcing concrete slab with dowels

On Feb 17, 10:53 am, Robert Allison wrote:
MiamiCuse wrote:
Thanks Robert did not think about that...ok


although I think they will rust anyways. The original slab I broke has wire
meshes in the concrete and they were all rusted, the cast iron drain below
that I replaced has exterior corrosion. The water table in Miami is very
high.


Install the rebars eccentrically and bent it straight? What size rebar?


MC


OK, this is a response to both your reply to Bob above, and to
this message. I have looked at the photo that you provided and
here are my recommendations;

You have enough room to drill rebar dowels straight into the
existing concrete, so do that. It is best if they are straight
and in the middle of the slab vertically. (I was picturing a
much narrower trench, where it would be difficult to get the
drill straight.)

Use #4 (1/2") rebar. Drill 1/2" holes and drive the dowels about
4-6" into the existing concrete. You could do this on 2' centers
along both sides of the trench, probably just two in the ends
(the short sides of your trench). Tie these together to form the
standard grid pattern. I usually install a short piece of rebar
in one side, and a long one in the other, then just tie the two
together with tie wire. I try to lap the two pieces by about 12
inches.

Don't shove sand up under the overhanging edges. It will compact
sideways, but not vertically (which is what you want). Instead,
mix up some slurry and pour it under there. You can make slurry
out of a very wet mix of standard premix, but I usually spend the
extra money and use a wet mix of non shrink grout. The
deleterious effects of the added water in the mix is minimized by
the extra strength of the grout. Pour this in so that it runs
under the existing concrete and fill it up to the BOTTOM of the
existing concrete. Let this set up, then pour your concrete over
this. You can use the sand to dam up the edge so you don't have
to use much of this slurry, just along the overhanging edges.

In addition, you could use a higher strength concrete, mix it
wet, and vibrate it under the existing slab. I don't like adding
water to concrete, so I would recommend the previous method.
Makes for a stronger concrete end product.

Last, but not least, use your concrete blade in your grinder to
get a straight vertical edge along the sides of the trench. Some
of the edges are straight enough, but you do NOT want concrete
feathered like it would be if you poured it like it is right now.

The best way to achieve straight edges is to cut the concrete to
about half its thickness with a masonry blade in either a
circular saw, or a grinder, then break off the remainder. You
want a fairly straight vertical edge on the existing concrete,
but it does not need to be perfect. You do not want your new
concrete to be less than 2" thick, ANYWHERE. I am not talking
about the sum of the new and the old, I am talking about just the
new portion that you are placing. If it feathers to nothing over
the existing concrete, it will not have the strength it needs to
maintain its integrity.

Seems like a lot here, but it really isn't.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX


MC-

I have nothing to add to Robert's post...do everything he suggests &
you'll be fine. Esp the straigtht cut & min thickess. filling with a
"floable" mix is much better than packing sand.

cheers
Bob
  #18   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 256
Default Reinforcing concrete slab with dowels

Mike Dobony wrote:
On Mon, 18 Feb 2008 00:32:10 GMT, Robert Allison wrote:


Mike Dobony wrote:


On Sun, 17 Feb 2008 11:26:06 -0500, MiamiCuse wrote:



"BobK207" wrote in message
...


On Feb 16, 9:09 pm, Robert Allison wrote:


MiamiCuse wrote:


I have a trench about 4; wide and 10' long in my slab that was opened
up for
plumbing drain relocation and now I am ready to close it up. I will
put the
sand back in and compact it real well, then termicide, then moisture
barrier, then I plan to add dowels to both sides of the existing slab
and
pour new concrete.

It is very difficult to do the dowels because the trench width it
irregular.
As I did the first two I started to think if I position the dowels
differently would it make the job easier and actually more effective?

Instead of drilling holes on existing edges, why put the end of the
dowel at
the bottom of one slab, then pound it deep into the sand as far as it
will
go at an incline, when the dowel is shortened to be about the same
width as
the trench, start pounding it down until it wedges into the existing
concrete on the other side. So basically the dowel will bridge the
trench

from below one slab to the middle of another slab, sort of pushing up

the
existing slab.

If I continue this pattern, alternating the dowels say every 16 inches,
I
will have an even number of dowels on each side, angled up. If I pour
concrete in and embed it into the new concrete, would it not be like
pretensioning it? Seems to me logically would hold the new concrete up
better...or am I nutz?

MC

No. Bad idea. The rebar is supposed to be protected from
exposure to earth or even air, because the most common problem
for rebar is failure due to rust. Embedding the rebar in the
dirt will drastically accelerate its deterioration due to
oxidation (rust). Your rebar should be no closer than 2" to the
dirt (or at the center of the slab, vertically).

In addition, the rebar in this instance is not to strengthen the
concrete, but to tie the old concrete to the new. This is to
keep the new and the old from settling differently. You want
both to act as a unit, therefore the dowels.

To make the job easier, instead of trying to drill straight into
the concrete, drill at a 45 degree or less angle (on the
horizontal axis) . Then install your rebar and bend it straight.
This allows you to get your hammer drill into tighter spaces.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX

MC-

Robert hit all the important points....follow his advice & your slab
will easily outlast you.

Don't & the slab will fail in a few years.

A variable speed rotary hammer will make drilling easier.

cheers
Bob

Thanks Bob! Again!

well part of the reason I was having that wild idea (bad idea) is because as
I sat in the trench drilling I realized the "existing slab" I am drilling
into on the opposing end is along an exterior wall. Here is a picture of
the trench:

http://i173.photobucket.com/albums/w...g?t=1203265107

The PVC drain is 4" in diameter so the trench is about 3' wide and a bit
more in some areas. To the right there you can see the supply line to the
toilet and that is where the exterior wall is. See where the PVC pipe from
"north" of the toilet drain goes near the wall and underneath? Well the
plumber had that section of the pipe tucked along the length of the wall
until it gets to the lav, which means the underside of the slab along half
the trench has been disturbed, moved, dig around...the slab is just
"hanging" out there, I am not sure how strong that is. It's only 10" side
until it hits the 8" concrete wall. Can that 10" of hanging slab with
nothing underneath (I will pack sand back in sideways) be strong enough to
"tie into" and hold the 4' wide new concrete I will be pouring?

I don't know. I am just not comfortable what I am looking at, may be I am
overanalyzing, but in retrospect I should have limited what the plumbers
torn up, but that's too late now.



Do NOT run the rebar all the way from one side to the other. The rebar
needed to tie into the existing slab should be no longer than about 8-12"
total, half in the old and half in the new. You can run the rebar the rest
of the new work, but don't tie it into the stubs from the existing slab.


Why not?




It has something to do with expansion. My brother in law did commercial
construction for a number of years and concrete work was central in a lot
of it. When he was helping me with repairs he taught me this one.


I am a general contractor (38 years in construction) and worked
for five years as a general foreman for a concrete placement
company. I have never heard that before and I would need a much
better reason not to do it than you have given me.

I always tie the steel together. For what its worth, the times
that a concrete repair was spec'd by an engineer, they required
the dowels with epoxy and all the steel tied together. Since
that is the way that slabs with rebar are done, I think I will
trust the engineers and my own experience.

But I am always willing to learn.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX
  #19   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 664
Default Reinforcing concrete slab with dowels


"Robert Allison" wrote in message
news:0G7uj.5880$N95.1345@trnddc03...
MiamiCuse wrote:

"MiamiCuse" wrote in message
...

"Robert Allison" wrote in message
newso%tj.4388$kD3.611@trnddc08...

MiamiCuse wrote:


Thanks Robert did not think about that...ok

although I think they will rust anyways. The original slab I broke has
wire meshes in the concrete and they were all rusted, the cast iron
drain below that I replaced has exterior corrosion. The water table in
Miami is very high.

Install the rebars eccentrically and bent it straight? What size
rebar?

MC

OK, this is a response to both your reply to Bob above, and to this
message. I have looked at the photo that you provided and here are my
recommendations;

You have enough room to drill rebar dowels straight into the existing
concrete, so do that. It is best if they are straight and in the middle
of the slab vertically. (I was picturing a much narrower trench, where
it would be difficult to get the drill straight.)

Use #4 (1/2") rebar. Drill 1/2" holes and drive the dowels about 4-6"
into the existing concrete. You could do this on 2' centers along both
sides of the trench, probably just two in the ends (the short sides of
your trench). Tie these together to form the standard grid pattern. I
usually install a short piece of rebar in one side, and a long one in
the other, then just tie the two together with tie wire. I try to lap
the two pieces by about 12 inches.

Don't shove sand up under the overhanging edges. It will compact
sideways, but not vertically (which is what you want). Instead, mix up
some slurry and pour it under there. You can make slurry out of a very
wet mix of standard premix, but I usually spend the extra money and use
a wet mix of non shrink grout. The deleterious effects of the added
water in the mix is minimized by the extra strength of the grout. Pour
this in so that it runs under the existing concrete and fill it up to
the BOTTOM of the existing concrete. Let this set up, then pour your
concrete over this. You can use the sand to dam up the edge so you
don't have to use much of this slurry, just along the overhanging edges.

In addition, you could use a higher strength concrete, mix it wet, and
vibrate it under the existing slab. I don't like adding water to
concrete, so I would recommend the previous method. Makes for a stronger
concrete end product.

Last, but not least, use your concrete blade in your grinder to get a
straight vertical edge along the sides of the trench. Some of the edges
are straight enough, but you do NOT want concrete feathered like it
would be if you poured it like it is right now.

The best way to achieve straight edges is to cut the concrete to about
half its thickness with a masonry blade in either a circular saw, or a
grinder, then break off the remainder. You want a fairly straight
vertical edge on the existing concrete, but it does not need to be
perfect. You do not want your new concrete to be less than 2" thick,
ANYWHERE. I am not talking about the sum of the new and the old, I am
talking about just the new portion that you are placing. If it feathers
to nothing over the existing concrete, it will not have the strength it
needs to maintain its integrity.

Seems like a lot here, but it really isn't.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX

Thanks Robert for all the advise. I have just one more questions.

This is another bathroom I need to pour concrete on. This trench is
smaller, where the widest part is about 3 feet and the narrow part 18".

The problem is the trench ends at the exterior wall B.

So in this case if I add dowels do I drill it into the wall?

Thanks again,

MC


oops forgot to attach an image link:

http://i173.photobucket.com/albums/w...8annotated.jpg


I can't tell from that photo, but if the slab is tied into the wall, then
I would also dowel the new patch as well. If they are separate entities,
leave them that way.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX


Robert:

Just one more question regarding using concrete mix under the overhanging
portions of the existing slab - since there are copper supply lines and PVC
drain lines tucked under the slab (the plumber deliberately excavated there
to route the pipes through...by packing concrete there wouldn't I be
embedding the drains and supply in concrete? Something about this makes me
uneasy. I can wrap the copper with sleeves (I plan to anyways) to avoid
contact with concrete, but seems there should be a way to provide support
without encasing the lines into hard concrete.

What is I take the big rocky chunks from the demolition of the original
slab, and wedge as many pieces as I can underneath, and pound them in with
rubber mallet? Will this work at all?

Thanks,

MC


  #20   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 256
Default Reinforcing concrete slab with dowels

MiamiCuse wrote:

Snipped

Robert:

Just one more question regarding using concrete mix under the overhanging
portions of the existing slab - since there are copper supply lines and PVC
drain lines tucked under the slab (the plumber deliberately excavated there
to route the pipes through...by packing concrete there wouldn't I be
embedding the drains and supply in concrete? Something about this makes me
uneasy. I can wrap the copper with sleeves (I plan to anyways) to avoid
contact with concrete, but seems there should be a way to provide support
without encasing the lines into hard concrete.

What is I take the big rocky chunks from the demolition of the original
slab, and wedge as many pieces as I can underneath, and pound them in with
rubber mallet? Will this work at all?

Thanks,

MC


No, don't do that. Sleave the copper and then fill with sand up
to the top of the pipes, so that they are just visible. Wet this
down to compact it and then add more sand if needed to almost
cover the pipes and repeat. As you wet it down, it should fill
all the voids in and around the pipes. After doing this, do the
slurry mix. (You should wet down the sand under all of the patch
just before you place your concrete anyway.)

If you think it is too tight, its not. Just make your slurry wet
enough to flow easily into all the gaps and crevices. As long as
you do this, your pipes may be touching the concrete, but it
won't be embedded in it. And even if it was, that is not a bad
thing in and of itself. It is bad if this causes your slab to be
less than 3 inches thick, because it would cause the concrete
over that pipe to crack along that pipe. Kind of like a control
joint in reverse.

Don't worry, be happy!

--
Robert Allison
Rimshot, Inc.
Georgetown, TX


  #21   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 327
Default Reinforcing concrete slab with dowels

On Mon, 18 Feb 2008 23:57:46 GMT, Robert Allison wrote:

Mike Dobony wrote:
On Mon, 18 Feb 2008 00:32:10 GMT, Robert Allison wrote:


Mike Dobony wrote:


On Sun, 17 Feb 2008 11:26:06 -0500, MiamiCuse wrote:



"BobK207" wrote in message
...


On Feb 16, 9:09 pm, Robert Allison wrote:


MiamiCuse wrote:


I have a trench about 4; wide and 10' long in my slab that was opened
up for
plumbing drain relocation and now I am ready to close it up. I will
put the
sand back in and compact it real well, then termicide, then moisture
barrier, then I plan to add dowels to both sides of the existing slab
and
pour new concrete.

It is very difficult to do the dowels because the trench width it
irregular.
As I did the first two I started to think if I position the dowels
differently would it make the job easier and actually more effective?

Instead of drilling holes on existing edges, why put the end of the
dowel at
the bottom of one slab, then pound it deep into the sand as far as it
will
go at an incline, when the dowel is shortened to be about the same
width as
the trench, start pounding it down until it wedges into the existing
concrete on the other side. So basically the dowel will bridge the
trench

from below one slab to the middle of another slab, sort of pushing up

the
existing slab.

If I continue this pattern, alternating the dowels say every 16 inches,
I
will have an even number of dowels on each side, angled up. If I pour
concrete in and embed it into the new concrete, would it not be like
pretensioning it? Seems to me logically would hold the new concrete up
better...or am I nutz?

MC

No. Bad idea. The rebar is supposed to be protected from
exposure to earth or even air, because the most common problem
for rebar is failure due to rust. Embedding the rebar in the
dirt will drastically accelerate its deterioration due to
oxidation (rust). Your rebar should be no closer than 2" to the
dirt (or at the center of the slab, vertically).

In addition, the rebar in this instance is not to strengthen the
concrete, but to tie the old concrete to the new. This is to
keep the new and the old from settling differently. You want
both to act as a unit, therefore the dowels.

To make the job easier, instead of trying to drill straight into
the concrete, drill at a 45 degree or less angle (on the
horizontal axis) . Then install your rebar and bend it straight.
This allows you to get your hammer drill into tighter spaces.

--
Robert Allison
Rimshot, Inc.
Georgetown, TX

MC-

Robert hit all the important points....follow his advice & your slab
will easily outlast you.

Don't & the slab will fail in a few years.

A variable speed rotary hammer will make drilling easier.

cheers
Bob

Thanks Bob! Again!

well part of the reason I was having that wild idea (bad idea) is because as
I sat in the trench drilling I realized the "existing slab" I am drilling
into on the opposing end is along an exterior wall. Here is a picture of
the trench:

http://i173.photobucket.com/albums/w...g?t=1203265107

The PVC drain is 4" in diameter so the trench is about 3' wide and a bit
more in some areas. To the right there you can see the supply line to the
toilet and that is where the exterior wall is. See where the PVC pipe from
"north" of the toilet drain goes near the wall and underneath? Well the
plumber had that section of the pipe tucked along the length of the wall
until it gets to the lav, which means the underside of the slab along half
the trench has been disturbed, moved, dig around...the slab is just
"hanging" out there, I am not sure how strong that is. It's only 10" side
until it hits the 8" concrete wall. Can that 10" of hanging slab with
nothing underneath (I will pack sand back in sideways) be strong enough to
"tie into" and hold the 4' wide new concrete I will be pouring?

I don't know. I am just not comfortable what I am looking at, may be I am
overanalyzing, but in retrospect I should have limited what the plumbers
torn up, but that's too late now.



Do NOT run the rebar all the way from one side to the other. The rebar
needed to tie into the existing slab should be no longer than about 8-12"
total, half in the old and half in the new. You can run the rebar the rest
of the new work, but don't tie it into the stubs from the existing slab.

Why not?




It has something to do with expansion. My brother in law did commercial
construction for a number of years and concrete work was central in a lot
of it. When he was helping me with repairs he taught me this one.


I am a general contractor (38 years in construction) and worked
for five years as a general foreman for a concrete placement
company. I have never heard that before and I would need a much
better reason not to do it than you have given me.

I always tie the steel together. For what its worth, the times
that a concrete repair was spec'd by an engineer, they required
the dowels with epoxy and all the steel tied together. Since
that is the way that slabs with rebar are done, I think I will
trust the engineers and my own experience.

But I am always willing to learn.


I don't know how good of a contractor you are, but I know whenever my b-i-l
bid a job he got it based on his reputation as a quality worker. He
learned from many experts in the field.

You also said you tied steel together, but you didn't mention running the
dowels the full length of the slab either.
  #22   Report Post  
Posted to alt.home.repair
external usenet poster
 
Posts: 664
Default Reinforcing concrete slab with dowels


"Robert Allison" wrote in message
news:ZOsuj.610$kI4.291@trnddc05...
MiamiCuse wrote:

Snipped

Robert:

Just one more question regarding using concrete mix under the overhanging
portions of the existing slab - since there are copper supply lines and
PVC drain lines tucked under the slab (the plumber deliberately excavated
there to route the pipes through...by packing concrete there wouldn't I
be embedding the drains and supply in concrete? Something about this
makes me uneasy. I can wrap the copper with sleeves (I plan to anyways)
to avoid contact with concrete, but seems there should be a way to
provide support without encasing the lines into hard concrete.

What is I take the big rocky chunks from the demolition of the original
slab, and wedge as many pieces as I can underneath, and pound them in
with rubber mallet? Will this work at all?

Thanks,

MC


No, don't do that. Sleave the copper and then fill with sand up to the
top of the pipes, so that they are just visible. Wet this down to compact
it and then add more sand if needed to almost cover the pipes and repeat.
As you wet it down, it should fill all the voids in and around the pipes.
After doing this, do the slurry mix. (You should wet down the sand under
all of the patch just before you place your concrete anyway.)

If you think it is too tight, its not. Just make your slurry wet enough
to flow easily into all the gaps and crevices. As long as you do this,
your pipes may be touching the concrete, but it won't be embedded in it.
And even if it was, that is not a bad thing in and of itself. It is bad
if this causes your slab to be less than 3 inches thick, because it would
cause the concrete over that pipe to crack along that pipe. Kind of like
a control joint in reverse.

Don't worry, be happy!

--
Robert Allison
Rimshot, Inc.
Georgetown, TX


Thanks Robert. I will try it.


Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
Steel reinforcing bar for concrete Andy Hall UK diy 6 June 21st 07 04:19 PM
concrete reinforcing fibres Peter Lynch UK diy 7 October 23rd 06 10:34 PM
Reinforcing concrete block wall? [email protected] Home Repair 8 September 26th 06 01:22 AM
Slab for AC not concrete... Home Repair 7 October 21st 04 06:17 PM
Concrete over broken concrete slab? Zen Cohen Home Repair 1 September 3rd 03 12:33 PM


All times are GMT +1. The time now is 07:48 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"