Home |
Search |
Today's Posts |
|
Home Repair (alt.home.repair) For all homeowners and DIYers with many experienced tradesmen. Solve your toughest home fix-it problems. |
Reply |
|
LinkBack | Thread Tools | Display Modes |
#1
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
I finished about 1400 sq. ft. of my basement with about 46 4x8 sheets
of drywall. All the sheets are standing up so the tapered ends are butted together. Each seam is about 7 feet long. There are 9 inside 90-degree corners, 5 outside 90-degree corners and two approximately 120-degree inside corners. I'm going to be looking for someone put on the outside corner metals & tape/mud/sand. For the typical contractor, is this a job that can be completed in a weekend? I know it will depend on the crew size but I'm not sure what a crew of any size can get done in a day. Thanks, Kevin |
#2
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
|
#3
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
" wrote in message ups.com... I finished about 1400 sq. ft. of my basement with about 46 4x8 sheets of drywall. All the sheets are standing up so the tapered ends are butted together. Each seam is about 7 feet long. There are 9 inside 90-degree corners, 5 outside 90-degree corners and two approximately 120-degree inside corners. I'm going to be looking for someone put on the outside corner metals & tape/mud/sand. For the typical contractor, is this a job that can be completed in a weekend? I know it will depend on the crew size but I'm not sure what a crew of any size can get done in a day. Thanks, Kevin I couldn't tell you how many man-hours is needed to do this job, but it is not likely it can be finished in two days because of the drying time. Usually the first coat of joint compound dries faster than the next two coats. At a minimum I think 3 days would be required because of that. |
#5
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
"Drywall finishers work on weekends in OP's area?" If they want the job they do. :-) |
#6
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
Typical quality requires 3 coats. 12 hours dry time each coat.
Setting compound can be used on the first coat. Most finishers I know would have zero interest in a weekend job. -- ______________________________ Keep the whole world singing . . . . DanG (remove the sevens) " wrote in message ups.com... "Drywall finishers work on weekends in OP's area?" If they want the job they do. :-) |
#7
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
DanG wrote:
Typical quality requires 3 coats. 12 hours dry time each coat. Setting compound can be used on the first coat. Most finishers I know would have zero interest in a weekend job. Area differences I suppose. There are plenty of hungry guys around here that work weekends. I've also used union guys. A few buddies would show up bright and early each weekend morning, knock the living crap out of the taping and spackling and knock off around 1 PM. They were "moonlighting" on the weekends and that was their only free time. R |
#8
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
"RicodJour" wrote in message oups.com... | DanG wrote: | Typical quality requires 3 coats. 12 hours dry time each coat. | Setting compound can be used on the first coat. Most finishers I | know would have zero interest in a weekend job. | | Area differences I suppose. There are plenty of hungry guys around | here that work weekends. I've also used union guys. A few buddies | would show up bright and early each weekend morning, knock the living | crap out of the taping and spackling and knock off around 1 PM. They | were "moonlighting" on the weekends and that was their only free time. | | R | union guys moon lighting isn't that against union policy? where are the dues? |
#9
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
" wrote in message ups.com... |I finished about 1400 sq. ft. of my basement with about 46 4x8 sheets | of drywall. All the sheets are standing up so the tapered ends are | butted together. Each seam is about 7 feet long. There are 9 inside | 90-degree corners, 5 outside 90-degree corners and two approximately | 120-degree inside corners. drywall (not moisture resistant) in the basement? green board (moisture resistant) is better. blueboard with plaster would have been the best choice and could have been completed in a few hours. | | I'm going to be looking for someone put on the outside corner metals & | tape/mud/sand. For the typical contractor, is this a job that can be | completed in a weekend? I know it will depend on the crew size but | I'm not sure what a crew of any size can get done in a day. | | Thanks, | Kevin not enough drying time to finish in 1 weekend unless they work all night. | |
#10
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
Got my first quote today. $750 to tape/mud/sand all the joints and
corners. The installer said it would take about 3 days to complete. One full day to get the first coat on everything and get the corners. Two more days at about 2-3 hours per day to put the rest of the coats on and finish it. Sounds reasonable to me. I guess I'll be comparing to my other quotes when I get them in about a week. But, how does the initial $750 sound for about 1150 square feet? High, low, or average? Thanks, Kevin |
#11
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
On Mar 22, 10:18 am, " wrote:
Got my first quote today. $750 to tape/mud/sand all the joints and corners. The installer said it would take about 3 days to complete. One full day to get the first coat on everything and get the corners. Two more days at about 2-3 hours per day to put the rest of the coats on and finish it. Sounds reasonable to me. I guess I'll be comparing to my other quotes when I get them in about a week. But, how does the initial $750 sound for about 1150 square feet? High, low, or average? Thanks, Kevin Don't ask questions like that unless you're of the belief that all contractor's are of equal quality, charge the same amount, estimate the same way and there are no differences in labor and material costs anywhere in the world. In order, the correct answers a they're not, they don't, they may or may not depending on the trade (probably not), there are huge differences and you never mentioned where you were. I personally believe it is pointless to ask what prices "should be" on Usenet. If the single best estimator/contractor in the world applies all of their mighty powers and provides you with the PERFECT number etched in stone, it might as well be written in invisible ink on toilet paper for the amount of weight that will carry with the contractors in your area. Unless someone sees the job and gives you a firm number, and, most importantly, is prepared to do the work in agreement with your schedule, the number is 100% useless. If you need to satisfy your curiosity, by all means get an additional estimate or two. R |
#12
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
On Mar 21, 5:41 am, "3G" wrote:
"RicodJour" wrote in message oups.com...| DanG wrote: | Typical quality requires 3 coats. 12 hours dry time each coat. | Setting compound can be used on the first coat. Most finishers I | know would have zero interest in a weekend job. | | Area differences I suppose. There are plenty of hungry guys around | here that work weekends. I've also used union guys. A few buddies | would show up bright and early each weekend morning, knock the living | crap out of the taping and spackling and knock off around 1 PM. They | were "moonlighting" on the weekends and that was their only free time. | union guys moon lighting isn't that against union policy? where are the dues? Where did you get that idea? The union is not interested in preventing their guys from working to earn money. If the guy is sitting on a bench they still have a family and expenses. If you call up the union hall or make a visit, they'll help you out. R |
#13
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
On Mar 21, 5:48 am, "3G" wrote:
" wrote in message |I finished about 1400 sq. ft. of my basement with about 46 4x8 sheets | of drywall. All the sheets are standing up so the tapered ends are | butted together. Each seam is about 7 feet long. There are 9 inside | 90-degree corners, 5 outside 90-degree corners and two approximately | 120-degree inside corners. drywall (not moisture resistant) in the basement? green board (moisture resistant) is better. Mold will grow just fine on either one, so I don't think you're referring to that. If the basement has such significant moisture problems that greenboard might be indicated, it would be far preferable to deal with the moisture problem before finishing the basement. blueboard with plaster would have been the best choice and could have been completed in a few hours. 1400 SF of skimcoat plaster in a few hours? Not even close unless you have a small army on hand. If it were that fast, no one would use drywall, tape and spackle. 1400 SF of skimcoat plaster would be much slower than 3 or 4 hundred linear feet of tapered edge taping and spackling, and a bit of bead work. If the OP's contractor isn't resistant to using setting type compound they could skip all of the drying time. R |
#14
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
"RicodJour" wrote in message ps.com... | On Mar 21, 5:48 am, "3G" wrote: | " wrote in message | | |I finished about 1400 sq. ft. of my basement with about 46 4x8 sheets | | of drywall. All the sheets are standing up so the tapered ends are | | butted together. Each seam is about 7 feet long. There are 9 inside | | 90-degree corners, 5 outside 90-degree corners and two approximately | | 120-degree inside corners. | | drywall (not moisture resistant) in the basement? | green board (moisture resistant) is better. | | Mold will grow just fine on either one, so I don't think you're | referring to that. nope the moisture will peel the paint off regular drywall you never use regular drywall in a basement......not here anyway. If the basement has such significant moisture | problems that greenboard might be indicated, now you see the light at the end of the tunnel. it would be far | preferable to deal with the moisture problem before finishing the | basement. concrete emitts moisture for years and years | | blueboard with plaster would have been the best choice and could have | been completed in a few hours. | | 1400 SF of skimcoat plaster in a few hours? Not even close unless you | have a small army on hand. are you kiddin me 1400 sf we would be home by 3pm 3 hours to hang and 5 hours to plaster and only 3 guys damn we must be good. If it were that fast, no one would use, | drywall, tape and spackle. only the cheap *******s do use drywall/tape/compound and home owners who don't know any better. | | 1400 SF of skimcoat plaster would be much slower than 3 or 4 hundred | linear feet of tapered edge taping and spackling, and a bit of bead | work. If the OP's contractor isn't resistant to using setting type | compound they could skip all of the drying time. | | R whats the R for................retard | |
#15
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
3G wrote:
"RicodJour" wrote in message ps.com... | On Mar 21, 5:48 am, "3G" wrote: | " wrote in message | | |I finished about 1400 sq. ft. of my basement with about 46 4x8 sheets | | of drywall. All the sheets are standing up so the tapered ends are | | butted together. Each seam is about 7 feet long. There are 9 inside | | 90-degree corners, 5 outside 90-degree corners and two approximately | | 120-degree inside corners. | | drywall (not moisture resistant) in the basement? | green board (moisture resistant) is better. | | Mold will grow just fine on either one, so I don't think you're | referring to that. nope the moisture will peel the paint off regular drywall you never use regular drywall in a basement......not here anyway. If the basement has such significant moisture | problems that greenboard might be indicated, now you see the light at the end of the tunnel. it would be far | preferable to deal with the moisture problem before finishing the | basement. concrete emitts moisture for years and years Let's see, I'm advising to take care of the moisture problem before finishing the basement and not rely on greenboard for protection, you argue against taking care of the moisture problem because concrete gives off moisture for years and years. Beside being an excellent example of frontier gibberish, you have no idea what you are talking about. Concrete does not release moisture for years. Moisture _may_ pass through the concrete, but there is only a limited amount of moisture in concrete mix. | blueboard with plaster would have been the best choice and could have | been completed in a few hours. | | 1400 SF of skimcoat plaster in a few hours? Not even close unless you | have a small army on hand. are you kiddin me 1400 sf we would be home by 3pm 3 hours to hang and 5 hours to plaster and only 3 guys damn we must be good. I really must apologize. I am standing in the presence of greatness. Less than a week ago you were telling us about the plasterer you _hired_ using _nails_ to tack up board on metal stud, and now you've graduated into Super Plasterer. I stand in awe of your learning ability. http://groups.google.com/group/alt.h...6c6b4bc41ce 7 I can hardly wait until next week's installment where you explain your technique for reattaching severed limbs. I guess you watch this show a lot: http://www.youtube.com/watch?v=tNfGyIW7aHM If it were that fast, no one would use, | drywall, tape and spackle. only the cheap *******s do use drywall/tape/compound and home owners who don't know any better. Feel better? | 1400 SF of skimcoat plaster would be much slower than 3 or 4 hundred | linear feet of tapered edge taping and spackling, and a bit of bead | work. If the OP's contractor isn't resistant to using setting type | compound they could skip all of the drying time. | | R whats the R for................retard | No, it stands for Rico, just like it says above. Thanks for asking. And learn to quote correctly, ya maroon. R |
#16
Posted to alt.home.repair
|
|||
|
|||
How Long to Talk / Type / Argue with a moron?
"RicodJour" wrote in message oups.com... | 3G wrote: | "RicodJour" wrote in message | ps.com... | | On Mar 21, 5:48 am, "3G" wrote: | | " wrote in message | | | | |I finished about 1400 sq. ft. of my basement with about 46 4x8 | sheets | | | of drywall. All the sheets are standing up so the tapered ends | are | | | butted together. Each seam is about 7 feet long. There are 9 | inside | | | 90-degree corners, 5 outside 90-degree corners and two | approximately | | | 120-degree inside corners. | | | | drywall (not moisture resistant) in the basement? | | green board (moisture resistant) is better. | | | | Mold will grow just fine on either one, so I don't think you're | | referring to that. | | nope | the moisture will peel the paint off regular drywall | you never use regular drywall in a basement......not here anyway. | | If the basement has such significant moisture | | problems that greenboard might be indicated, | | now you see the light at the end of the tunnel. | | | it would be far | | preferable to deal with the moisture problem before finishing the | | basement. | | | concrete emitts moisture for years and years | | Let's see, I'm advising to take care of the moisture problem before | finishing the basement and not rely on greenboard for protection, you | argue against taking care of the moisture problem because concrete | gives off moisture for years and years. a dehumidifier..........no brainer! | | Beside being an excellent example of frontier gibberish, you have no | idea what you are talking about. correction you have no idea what I am talking about I will type slower next time..............sorry Concrete does not release moisture | for years. actually it does release moisture for years it takes aprox. 100 years for concrete to fully cure. read up on it Moisture _may_ pass through the concrete, but there is | only a limited amount of moisture in concrete mix. | | | blueboard with plaster would have been the best choice and could | have | | been completed in a few hours. | | | | 1400 SF of skimcoat plaster in a few hours? Not even close unless you | | have a small army on hand. | | | are you kiddin me | 1400 sf | we would be home by 3pm | | 3 hours to hang and 5 hours to plaster | and only 3 guys | damn we must be good. | | I really must apologize. I am standing in the presence of greatness. now you uderstand finally | Less than a week ago you were telling us about the plasterer you | _hired_ using _nails_ to tack up board on metal stud, that is correct I hired an incompetant plasterer to do a job for me and they made a mess everywhere. I can't do every job sometimes I sub the work out. and now you've | graduated into Super Plasterer. graduated years ago.............................many.............. ..many years ago. I stand in awe of your learning | ability. thats what the shop teacher told me many years ago. | http://groups.google.com/group/alt.h...6c6b4bc41ce 7 | | I can hardly wait until next week's installment where you explain your | technique for reattaching severed limbs. I opted to sub that job out I do have limits you know. I guess you watch this show | a lot: | http://www.youtube.com/watch?v=tNfGyIW7aHM I never watch tv.................too busy with work. | | If it were that fast, no one would use, | | drywall, tape and spackle. | | only the cheap *******s do use drywall/tape/compound | and home owners who don't know any better. | | Feel better? a little how bout you? | | | 1400 SF of skimcoat plaster would be much slower than 3 or 4 hundred | | linear feet of tapered edge taping and spackling, and a bit of bead | | work. If the OP's contractor isn't resistant to using setting type | | compound they could skip all of the drying time. | | | | R | whats the R for................retard | | | | yes, it stands for Retardo, just like it says on my lunch box. Thanks for asking. | | And learn to quote correctly, ya maroon. I just love "maroons" with coffee. what the hell do you know Retardo you think "spackle" is used for taping drywall. oh boy, oh boy, oh boy | | R | |
#17
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
Listen, Roger, what exactly do you think you're accomplishing here?
Are ya "winning"? You're giving some sketchy advice, based on your prejudices, which are in turn based on faulty information. Do me a favor, show this thread to your father - he's still working with you, right? - and see if you're making him proud. Concrete gets harder and stronger as the decades pass and the curing does continue, but concrete does not have an unlimited amount of moisture to give off. Cement undergoes a chemical reaction, binds the water it needs, and releases the excess. The excess water does not stick around for 100 years slowly releasing it. There is not enough moisture released after the first couple or three months to appreciably affect a basement's moisture level. If there is a basement moisture problem, the water is coming from a source other than the concrete foundation walls. If there is a basement moisture problem, you deal with it before finishing off the basement. Suggesting a dehumidifier is similar suggesting using an IV to add blood to compensate for the bleeding. Might work in the short term, bad idea in the long term. The fact that you hired a plasterer that used nails at all on a metal stud job, and wrote about it as an acceptable method, calls your knowledge into question, on both technical and hiring grounds. My vernacular in referring to taping and spackling, is partially a regional thing - that's how it was referred to when I started in construction, and partially an idiomatic thing - like bandaid. I'm sure while you're standing there bleeding on the floor, you yell out, "Someone get me a self-adhesive bandage!" In any event, this thread is about the OP's needs. Your comment that only cheap homeowners use drywall is insulting to him and off-base for the reasons I've already mentioned. Your suggestion to go with plaster veneer would cost more - depending on the area, maybe 30 to 50 percent more - and it can't be put on the existing drywall anyway. You answered the question, "Do I really need to put premium gas in my Honda?" with "Honda's suck. You should sell it and get a Lexus." Excellent advice. I'm sure the OP appreciates it. BTW, you may want to correct your web site about your design capabilities - it's misleading. "Plans pass town hall approval for permit in most states" In most states a licensed architect or engineer - licensed in that state - must sign off on the plans. You know that - say that. You shouldn't offer things you can't provide. Here's an example of one site's wording: "Do some building departments require engineer {or architect} sealed building plans to obtain a building permit? Yes. This means that a licensed engineer {or architect} for your state has to review {insert company name here}'s building plans to assure that they comply with your state's building requirements. Once the engineer {or architect} reviews the plans and no changes are needed, he or she applies his engineering {or architect's} stamp and his signature to the plans. This means he takes responsibility for the design not the building department. If there are needed changes, the engineer {or architect} usually faxes {insert company name here} notes and sketches that we need to incorporate or change in the plans." See? That's not misleading at all. R PS I took the liberty of crossposting this to a couple of related newsgroups. For those other groups, the full thread can be found he http://tinyurl.com/yumsg3 |
#18
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
On Mar 21, 4:48 am, "3G" wrote:
" drywall (not moisture resistant) in the basement? green board (moisture resistant) is better. blueboard with plaster would have been the best choice and could have been completed in a few hours. moisture resistant drywall in a basement because concrete gives off moisture? What planet are you from? I'm with Rico all the way! |
#19
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
RicodJour wrote:
Listen, Roger, what exactly do you think you're accomplishing here? Are ya "winning"? You're giving some sketchy advice, based on your prejudices, which are in turn based on faulty information. Do me a favor, show this thread to your father - he's still working with you, right? - and see if you're making him proud. Concrete gets harder and stronger as the decades pass and the curing does continue, but concrete does not have an unlimited amount of moisture to give off. Cement undergoes a chemical reaction, binds the water it needs, and releases the excess. The excess water does not stick around for 100 years slowly releasing it. There is not enough moisture released after the first couple or three months to appreciably affect a basement's moisture level. If there is a basement moisture problem, the water is coming from a source other than the concrete foundation walls. If there is a basement moisture problem, you deal with it before finishing off the basement. Suggesting a dehumidifier is similar suggesting using an IV to add blood to compensate for the bleeding. Might work in the short term, bad idea in the long term. The fact that you hired a plasterer that used nails at all on a metal stud job, and wrote about it as an acceptable method, calls your knowledge into question, on both technical and hiring grounds. My vernacular in referring to taping and spackling, is partially a regional thing - that's how it was referred to when I started in construction, and partially an idiomatic thing - like bandaid. I'm sure while you're standing there bleeding on the floor, you yell out, "Someone get me a self-adhesive bandage!" In any event, this thread is about the OP's needs. Your comment that only cheap homeowners use drywall is insulting to him and off-base for the reasons I've already mentioned. Your suggestion to go with plaster veneer would cost more - depending on the area, maybe 30 to 50 percent more - and it can't be put on the existing drywall anyway. You answered the question, "Do I really need to put premium gas in my Honda?" with "Honda's suck. You should sell it and get a Lexus." Excellent advice. I'm sure the OP appreciates it. BTW, you may want to correct your web site about your design capabilities - it's misleading. "Plans pass town hall approval for permit in most states" In most states a licensed architect or engineer - licensed in that state - must sign off on the plans. You know that - say that. You shouldn't offer things you can't provide. Here's an example of one site's wording: "Do some building departments require engineer {or architect} sealed building plans to obtain a building permit? Yes. This means that a licensed engineer {or architect} for your state has to review {insert company name here}'s building plans to assure that they comply with your state's building requirements. Once the engineer {or architect} reviews the plans and no changes are needed, he or she applies his engineering {or architect's} stamp and his signature to the plans. This means he takes responsibility for the design not the building department. If there are needed changes, the engineer {or architect} usually faxes {insert company name here} notes and sketches that we need to incorporate or change in the plans." See? That's not misleading at all. Not misleading, but illegal in most states. "Plan Stamping" or the reviewing of plans prepared by others is not legal in any of the states I'm registered in... |
#20
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
"3D Peruna" wrote in message ... RicodJour wrote: Listen, Roger, what exactly do you think you're accomplishing here? Are ya "winning"? You're giving some sketchy advice, based on your prejudices, which are in turn based on faulty information. Do me a favor, show this thread to your father - he's still working with you, right? - and see if you're making him proud. Concrete gets harder and stronger as the decades pass and the curing does continue, but concrete does not have an unlimited amount of moisture to give off. Cement undergoes a chemical reaction, binds the water it needs, and releases the excess. The excess water does not stick around for 100 years slowly releasing it. There is not enough moisture released after the first couple or three months to appreciably affect a basement's moisture level. If there is a basement moisture problem, the water is coming from a source other than the concrete foundation walls. If there is a basement moisture problem, you deal with it before finishing off the basement. Suggesting a dehumidifier is similar suggesting using an IV to add blood to compensate for the bleeding. Might work in the short term, bad idea in the long term. The fact that you hired a plasterer that used nails at all on a metal stud job, and wrote about it as an acceptable method, calls your knowledge into question, on both technical and hiring grounds. My vernacular in referring to taping and spackling, is partially a regional thing - that's how it was referred to when I started in construction, and partially an idiomatic thing - like bandaid. I'm sure while you're standing there bleeding on the floor, you yell out, "Someone get me a self-adhesive bandage!" In any event, this thread is about the OP's needs. Your comment that only cheap homeowners use drywall is insulting to him and off-base for the reasons I've already mentioned. Your suggestion to go with plaster veneer would cost more - depending on the area, maybe 30 to 50 percent more - and it can't be put on the existing drywall anyway. You answered the question, "Do I really need to put premium gas in my Honda?" with "Honda's suck. You should sell it and get a Lexus." Excellent advice. I'm sure the OP appreciates it. BTW, you may want to correct your web site about your design capabilities - it's misleading. "Plans pass town hall approval for permit in most states" In most states a licensed architect or engineer - licensed in that state - must sign off on the plans. You know that - say that. You shouldn't offer things you can't provide. Here's an example of one site's wording: "Do some building departments require engineer {or architect} sealed building plans to obtain a building permit? Yes. This means that a licensed engineer {or architect} for your state has to review {insert company name here}'s building plans to assure that they comply with your state's building requirements. Once the engineer {or architect} reviews the plans and no changes are needed, he or she applies his engineering {or architect's} stamp and his signature to the plans. This means he takes responsibility for the design not the building department. If there are needed changes, the engineer {or architect} usually faxes {insert company name here} notes and sketches that we need to incorporate or change in the plans." See? That's not misleading at all. Not misleading, but illegal in most states. "Plan Stamping" or the reviewing of plans prepared by others is not legal in any of the states I'm registered in... Completely illegal here too. (Ontario) -- MichaelB www.michaelbulatovich.ca |
#21
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
"Michael Bulatovich" wrote in message
... "3D Peruna" wrote in message ... RicodJour wrote: "Plans pass town hall approval for permit in most states" In most states a licensed architect or engineer - licensed in that state - must sign off on the plans. You know that - say that. You shouldn't offer things you can't provide. [snip] Here's an example of one site's wording: [snip] See? That's not misleading at all. Not misleading, but illegal in most states. "Plan Stamping" or the reviewing of plans prepared by others is not legal in any of the states I'm registered in... Completely illegal here too. (Ontario) Sigh!!!!! |
#22
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
"3D Peruna" wrote
Not misleading, but illegal in most states. "Plan Stamping" or the reviewing of plans prepared by others is not legal in any of the states I'm registered in... Its all a matter of wording. Just cause YOU call it *reviewing* doesn't make it so. I know plenty of architects and engineers that have boilerplate sheets made up with stuff like standard details of headers, footing steel, sill sections, etc. that simply date and stamp them and sell them to the homeowner or others for a few hundred bux. The homeowner or builder includes them with the rest of the permit package and everyone's happy. When the code changed in 1992 requiring architects and/or engineers to stamp ALL plans submitted for permit this created a finacial boon for all of them. Architects and engineers design less than 5% of all the homes in SW FL but they make money off of ALL of them, by law. |
#23
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
Don,
I think we had this conversation a couple of years ago; if you are not a" licensed design professional", i.e. a P.E. or R.A., then you're a draftsman or cad operator; nothing more as far as the laws of most states are concerned. I think the day of the unlicensed "designer" is nearing an end, if it hasn't already ended. Tom "Don" wrote in message ... "3D Peruna" wrote Not misleading, but illegal in most states. "Plan Stamping" or the reviewing of plans prepared by others is not legal in any of the states I'm registered in... Its all a matter of wording. Just cause YOU call it *reviewing* doesn't make it so. I know plenty of architects and engineers that have boilerplate sheets made up with stuff like standard details of headers, footing steel, sill sections, etc. that simply date and stamp them and sell them to the homeowner or others for a few hundred bux. The homeowner or builder includes them with the rest of the permit package and everyone's happy. When the code changed in 1992 requiring architects and/or engineers to stamp ALL plans submitted for permit this created a finacial boon for all of them. Architects and engineers design less than 5% of all the homes in SW FL but they make money off of ALL of them, by law. |
#24
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
In the city and county I lived in (Cape Coral, Lee County) there was no
business classification for *designer*. The closest classification was Interior Designer. Nor is there a classification for CAD anything. Things may be different now as its been 2 years or more since I checked into it. Calling yourself a *desgner* in public in FL can get you nailed big time. "Tom Cular" wrote in message news:XvgNh.2040$yo3.964@trnddc04... Don, I think we had this conversation a couple of years ago; if you are not a" licensed design professional", i.e. a P.E. or R.A., then you're a draftsman or cad operator; nothing more as far as the laws of most states are concerned. I think the day of the unlicensed "designer" is nearing an end, if it hasn't already ended. Tom "Don" wrote in message ... "3D Peruna" wrote Not misleading, but illegal in most states. "Plan Stamping" or the reviewing of plans prepared by others is not legal in any of the states I'm registered in... Its all a matter of wording. Just cause YOU call it *reviewing* doesn't make it so. I know plenty of architects and engineers that have boilerplate sheets made up with stuff like standard details of headers, footing steel, sill sections, etc. that simply date and stamp them and sell them to the homeowner or others for a few hundred bux. The homeowner or builder includes them with the rest of the permit package and everyone's happy. When the code changed in 1992 requiring architects and/or engineers to stamp ALL plans submitted for permit this created a finacial boon for all of them. Architects and engineers design less than 5% of all the homes in SW FL but they make money off of ALL of them, by law. |
#25
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
"marson" wrote in message ups.com... | On Mar 21, 4:48 am, "3G" wrote: | " | drywall (not moisture resistant) in the basement? | green board (moisture resistant) is better. | | blueboard with plaster would have been the best choice and could have | been completed in a few hours. | | | moisture resistant drywall in a basement because concrete gives off | moisture? What planet are you from? I'm with Rico all the way! of course you are, holding hands, skipping and swinging your arms like little kids. | |
#26
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
"RicodJour" wrote in message oups.com... | Listen, Retardo, what exactly do you think you're accomplishing here? | Are ya "whining"? | | You're giving some sketchy advice, based on your prejudices, which are | in turn based on faulty information. | You answered the question, "Do I really need to put premium gas in my | Honda?" with "Honda's suck. You should sell it and get a Lexus." | Excellent advice. I'm sure the OP appreciates it. what the.......who the.............yahhhhh right. | | BTW, you may want to correct your web site about your design | capabilities - it's misleading. like every other advertisement in the world. | "Plans pass town hall approval for permit in most states" | In most states a licensed architect or engineer - licensed in that | state - must sign off on the plans. you are incorrect.........again haven't needed an architect or engineer stamp or license for years. and YES I design additions, kitchens, bathrooms, whole houses,etc. they DO pass town halls aproval and do every week. You know that - say that. You | shouldn't offer things you can't provide. I can provide far more experiences than you ever will. and I do sell plans to other states around the USA everywhere else...............I don't care. BTW the plans page you were on has made over $35,000 since 2001 just the 1 page...................................... wow, I guess it is misleading! thanks for the pep talk I'm ready again..........lets go. snipped your stupid tinyurl I didn't realize that you were artie boy disguised Retardo........he he he |
#27
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
"3D Peruna" wrote in message ... | RicodJour wrote: | snipped the story book romance | Not misleading, but illegal in most states. "Plan Stamping" or the | reviewing of plans prepared by others is not legal in any of the states | I'm registered in... | then move you live in a corrupted state |
#28
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
"Michael Bulatovich" wrote in message ... | | "3D Peruna" wrote in message | ... | RicodJour wrote: | snipped | | Completely illegal here too. (Ontario) wow............that hurts with all the legal porn in that damn country unstamped plans are illegal your countries moral standards are way off base. not to mention the largest terrorists groups in North America. The only great thing that comes from canada is their "ginger ale". oh wait.......thats from the USA. we just make canada look good as usual. | -- | | | MichaelB | www.michaelbulatovich.ca | | |
#29
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
"Don" wrote in message ... | In the city and county I lived in (Cape Coral, Lee County) there was no | business classification for *designer*. | The closest classification was Interior Designer. | Nor is there a classification for CAD anything. | Things may be different now as its been 2 years or more since I checked into | it. | Calling yourself a *desgner* in public in FL can get you nailed big time. thats because designers in FL make pills. hence the term "designer drugs" | | | "Tom Cular" wrote in message | news:XvgNh.2040$yo3.964@trnddc04... | Don, | | I think we had this conversation a couple of years ago; if you are not a" | licensed design professional", i.e. a P.E. or R.A., then you're a | draftsman or cad operator; nothing more as far as the laws of most states | are concerned. I think the day of the unlicensed "designer" is nearing an | end, if it hasn't already ended. | | Tom | "Don" wrote in message | ... | "3D Peruna" wrote | Not misleading, but illegal in most states. "Plan Stamping" or the | reviewing of plans prepared by others is not legal in any of the states | I'm registered in... | | Its all a matter of wording. | Just cause YOU call it *reviewing* doesn't make it so. | I know plenty of architects and engineers that have boilerplate sheets | made up with stuff like standard details of headers, footing steel, sill | sections, etc. that simply date and stamp them and sell them to the | homeowner or others for a few hundred bux. The homeowner or builder | includes them with the rest of the permit package and everyone's happy. | When the code changed in 1992 requiring architects and/or engineers to | stamp ALL plans submitted for permit this created a finacial boon for all | of them. Architects and engineers design less than 5% of all the homes in | SW FL but they make money off of ALL of them, by law. | | | | | |
#30
Posted to alt.home.repair
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
How do your comments have anything to do with the original topic.
Take your rants elsewhere. |
#31
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
3G wrote:
"3D Peruna" wrote in message ... | RicodJour wrote: | snipped the story book romance | Not misleading, but illegal in most states. "Plan Stamping" or the | reviewing of plans prepared by others is not legal in any of the states | I'm registered in... | then move you live in a corrupted state To a different corrupted state... |
#32
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
On Mar 24, 11:44 am, 3D Peruna wrote:
RicodJour wrote: Listen, Roger, what exactly do you think you're accomplishing here? Are ya "winning"? You're giving some sketchy advice, based on your prejudices, which are in turn based on faulty information. Do me a favor, show this thread to your father - he's still working with you, right? - and see if you're making him proud. Concrete gets harder and stronger as the decades pass and the curing does continue, but concrete does not have an unlimited amount of moisture to give off. Cement undergoes a chemical reaction, binds the water it needs, and releases the excess. The excess water does not stick around for 100 years slowly releasing it. There is not enough moisture released after the first couple or three months to appreciably affect a basement's moisture level. If there is a basement moisture problem, the water is coming from a source other than the concrete foundation walls. If there is a basement moisture problem, you deal with it before finishing off the basement. Suggesting a dehumidifier is similar suggesting using an IV to add blood to compensate for the bleeding. Might work in the short term, bad idea in the long term. The fact that you hired a plasterer that used nails at all on a metal stud job, and wrote about it as an acceptable method, calls your knowledge into question, on both technical and hiring grounds. My vernacular in referring to taping and spackling, is partially a regional thing - that's how it was referred to when I started in construction, and partially an idiomatic thing - like bandaid. I'm sure while you're standing there bleeding on the floor, you yell out, "Someone get me a self-adhesive bandage!" In any event, this thread is about the OP's needs. Your comment that only cheap homeowners use drywall is insulting to him and off-base for the reasons I've already mentioned. Your suggestion to go with plaster veneer would cost more - depending on the area, maybe 30 to 50 percent more - and it can't be put on the existing drywall anyway. You answered the question, "Do I really need to put premium gas in my Honda?" with "Honda's suck. You should sell it and get a Lexus." Excellent advice. I'm sure the OP appreciates it. BTW, you may want to correct your web site about your design capabilities - it's misleading. "Plans pass town hall approval for permit in most states" In most states a licensed architect or engineer - licensed in that state - must sign off on the plans. You know that - say that. You shouldn't offer things you can't provide. Here's an example of one site's wording: "Do some building departments require engineer {or architect} sealed building plans to obtain a building permit? Yes. This means that a licensed engineer {or architect} for your state has to review {insert company name here}'s building plans to assure that they comply with your state's building requirements. Once the engineer {or architect} reviews the plans and no changes are needed, he or she applies his engineering {or architect's} stamp and his signature to the plans. This means he takes responsibility for the design not the building department. If there are needed changes, the engineer {or architect} usually faxes {insert company name here} notes and sketches that we need to incorporate or change in the plans." See? That's not misleading at all. Not misleading, but illegal in most states. "Plan Stamping" or the reviewing of plans prepared by others is not legal in any of the states I'm registered in... Really? I thought a arch/eng could stamp plans under 2 circumstances: either the plans were designed under the arch/eng's supervision or as long as the arch/eng reviewed the plans to ensure that they met code, were structurally sufficient, etc. Granted, that might take nearly as long as the design but I thought it was okay as long as an actual review was made (i.e. they just don't stamp them without checking code). I mean, it is possible/likely that you find a set of plans on the internet for $500 and pay $5000 to have them reviewed. But it would be legal cause the stamper reviewed EVERYTHING and therefore could ensure code complaince. |
#33
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
"Pat" wrote in message oups.com... On Mar 24, 11:44 am, 3D Peruna wrote: RicodJour wrote: Not misleading, but illegal in most states. "Plan Stamping" or the reviewing of plans prepared by others is not legal in any of the states I'm registered in... Really? I thought a arch/eng could stamp plans under 2 circumstances: either the plans were designed under the arch/eng's supervision or as long as the arch/eng reviewed the plans to ensure that they met code, were structurally sufficient, etc. Granted, that might take nearly as long as the design but I thought it was okay as long as an actual review was made (i.e. they just don't stamp them without checking code). I mean, it is possible/likely that you find a set of plans on the internet for $500 and pay $5000 to have them reviewed. But it would be legal cause the stamper reviewed EVERYTHING and therefore could ensure code complaince. Only the first 'circumstance' is legal in Ontario. Review for code compliance is not the only type of responsibility that the stamp signifies. It is also for "responsible control" of the design. There are all kinds of aspects of a design which are not necessarily EXPLICITLY cited in drawings but which can make or break a project. The designer is responsible for them, but someone reviewing for code compliance may not appreciate them because the documents do not describe them. By putting the stamp on the drawings I'm taking responsibility for the whole show, and my association wants me to be sure that I've thought about all of it. (There is a new condition here after recent legislation that permits me to stamp drawings for code compliance if another ***architect*** takes responsibility for the rest. I can't stamp the drawings of non-architects at all, although I'm asked to again and again because I'm a 'little guy' who presumably would throw away 26 years of work for a G-note.) -- MichaelB www.michaelbulatovich.ca |
#34
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
Michael Bulatovich wrote:
By putting the stamp on the drawings I'm taking responsibility for the whole show, and my association wants me to be sure that I've thought about all of it. You meant to say the law, not your association, right? The desires of your association and the letter of the law are not necessarily the same. Or are they? R |
#35
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
"RicodJour" wrote in message oups.com... Michael Bulatovich wrote: By putting the stamp on the drawings I'm taking responsibility for the whole show, and my association wants me to be sure that I've thought about all of it. You meant to say the law, not your association, right? The desires of your association and the letter of the law are not necessarily the same. Or are they? Yes they are. It's the governing body. If I don't comply, I'm out with Don, only poorer and with less hair. |
#36
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
Michael Bulatovich wrote:
"RicodJour" wrote in message Michael Bulatovich wrote: By putting the stamp on the drawings I'm taking responsibility for the whole show, and my association wants me to be sure that I've thought about all of it. You meant to say the law, not your association, right? The desires of your association and the letter of the law are not necessarily the same. Or are they? Yes they are. It's the governing body. If I don't comply, I'm out with Don, only poorer and with less hair. Yetis have less hair. When you mentioned association, I thought you were talking about the cocktails and bow ties association of architects. R |
#37
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
On Mar 26, 7:25 am, "Michael Bulatovich" wrote:
"Pat" wrote in message oups.com... On Mar 24, 11:44 am, 3D Peruna wrote: RicodJour wrote: Not misleading, but illegal in most states. "Plan Stamping" or the reviewing of plans prepared by others is not legal in any of the states I'm registered in... Really? I thought a arch/eng could stamp plans under 2 circumstances: either the plans were designed under the arch/eng's supervision or as long as the arch/eng reviewed the plans to ensure that they met code, were structurally sufficient, etc. Granted, that might take nearly as long as the design but I thought it was okay as long as an actual review was made (i.e. they just don't stamp them without checking code). I mean, it is possible/likely that you find a set of plans on the internet for $500 and pay $5000 to have them reviewed. But it would be legal cause the stamper reviewed EVERYTHING and therefore could ensure code complaince. Only the first 'circumstance' is legal in Ontario. Review for code compliance is not the only type of responsibility that the stamp signifies. It is also for "responsible control" of the design. There are all kinds of aspects of a design which are not necessarily EXPLICITLY cited in drawings but which can make or break a project. The designer is responsible for them, but someone reviewing for code compliance may not appreciate them because the documents do not describe them. By putting the stamp on the drawings I'm taking responsibility for the whole show, and my association wants me to be sure that I've thought about all of it. (There is a new condition here after recent legislation that permits me to stamp drawings for code compliance if another ***architect*** takes responsibility for the rest. I can't stamp the drawings of non-architects at all, although I'm asked to again and again because I'm a 'little guy' who presumably would throw away 26 years of work for a G-note.) -- MichaelBwww.michaelbulatovich.ca I deal with funding all day and therefore whenever I see a regulation I like to push and probe it a little and see what it really encompasses. So let me pose a hypothetical. I am not trying to be a PITA, I'm just curious about that reg because I believe it is an unobtainable prohibition. Let's say you are putting an addition on a older building -- all concrete, steel, asbestos, etc. etc. You have the As Builts but the original architect is dead and buried. But he did a good job and gave you great drawings with incredible details. So you figure you want to punch a few holes through the building, bring in some mechanicals and a couple of doorways. So you need to be concerned with the structural elements of the exisiting building -- is it structurally sound, etc. etc. Plus you'll be doing some rehab over there so you need to bring portions of that building up to code -- say new interior walls, new HVAC, new electrical, ADA, and maybe a new elevator. Now there's now way your new work is done "stand along" because you're tying in to an existing building. You need to show certain elements of that building. So what you are saying is that the law says you cannot rely at all on the old drawings and then confirm the details, and check for code compliance as part of stamping plans for the new building and the reno. Instead, you must go out, take your own measurements, make your own determinations as to what the materials are, somehow find buried pipes, etc. so that you can show them on your plans? That may be the law, but that doesn't make sense. In this case, relying on the old dead guy will probably give you much better info than you could find without his plans. Seems like there has be some discretion there. No? I mean, you have control of your new design, but you have no control of the design of the building that is already built but you have to show parts of it on your plans. Just wondering. |
#38
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
"Pat" wrote in message ups.com... On Mar 26, 7:25 am, "Michael Bulatovich" wrote: "Pat" wrote in message oups.com... On Mar 24, 11:44 am, 3D Peruna wrote: RicodJour wrote: Not misleading, but illegal in most states. "Plan Stamping" or the reviewing of plans prepared by others is not legal in any of the states I'm registered in... Really? I thought a arch/eng could stamp plans under 2 circumstances: either the plans were designed under the arch/eng's supervision or as long as the arch/eng reviewed the plans to ensure that they met code, were structurally sufficient, etc. Granted, that might take nearly as long as the design but I thought it was okay as long as an actual review was made (i.e. they just don't stamp them without checking code). I mean, it is possible/likely that you find a set of plans on the internet for $500 and pay $5000 to have them reviewed. But it would be legal cause the stamper reviewed EVERYTHING and therefore could ensure code complaince. Only the first 'circumstance' is legal in Ontario. Review for code compliance is not the only type of responsibility that the stamp signifies. It is also for "responsible control" of the design. There are all kinds of aspects of a design which are not necessarily EXPLICITLY cited in drawings but which can make or break a project. The designer is responsible for them, but someone reviewing for code compliance may not appreciate them because the documents do not describe them. By putting the stamp on the drawings I'm taking responsibility for the whole show, and my association wants me to be sure that I've thought about all of it. (There is a new condition here after recent legislation that permits me to stamp drawings for code compliance if another ***architect*** takes responsibility for the rest. I can't stamp the drawings of non-architects at all, although I'm asked to again and again because I'm a 'little guy' who presumably would throw away 26 years of work for a G-note.) -- MichaelBwww.michaelbulatovich.ca I deal with funding all day and therefore whenever I see a regulation I like to push and probe it a little and see what it really encompasses. So let me pose a hypothetical. I am not trying to be a PITA, I'm just curious about that reg because I believe it is an unobtainable prohibition. Let's say you are putting an addition on a older building -- all concrete, steel, asbestos, etc. etc. You have the As Builts but the original architect is dead and buried. But he did a good job and gave you great drawings with incredible details. So you figure you want to punch a few holes through the building, bring in some mechanicals and a couple of doorways. So you need to be concerned with the structural elements of the exisiting building -- is it structurally sound, etc. etc. Plus you'll be doing some rehab over there so you need to bring portions of that building up to code -- say new interior walls, new HVAC, new electrical, ADA, and maybe a new elevator. Now there's now way your new work is done "stand along" because you're tying in to an existing building. You need to show certain elements of that building. So what you are saying is that the law says you cannot rely at all on the old drawings and then confirm the details, and check for code compliance as part of stamping plans for the new building and the reno. Instead, you must go out, take your own measurements, make your own determinations as to what the materials are, somehow find buried pipes, etc. so that you can show them on your plans? That may be the law, but that doesn't make sense. In this case, relying on the old dead guy will probably give you much better info than you could find without his plans. Seems like there has be some discretion there. No? I mean, you have control of your new design, but you have no control of the design of the building that is already built but you have to show parts of it on your plans. Just wondering. I am doing just that on a job. I have plans from 1905 and remodeling from 1931. I have to depend on those drawings (and they appear to be accurate) because there is a restaurant in the space that can not shut down till August for the remodeling, so all hidden work must be trusted to be correct. I'm sure we will find some discrepancies, but no major ones. The City has accepted the plans with attached sections of the originals. EDS |
#39
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
In a previous post 3D Peruna wrote...
Not misleading, but illegal in most states. "Plan Stamping" or the reviewing of plans prepared by others is not legal in any of the states I'm registered in... Same for me. Documents must be prepared under direct supervision of the design professional who places his/her seal on the documents. I don't stamp house plans that I have reviewed unless I redraw them. -- Bob Morrison, PE, SE R L Morrison Engineering Co Structural & Civil Engineering Poulsbo WA bob at rlmorrisonengr dot com |
#40
Posted to alt.home.repair,alt.building.construction,alt.architecture
|
|||
|
|||
How Long to Tape / Mud / Sand Drywall ?
In a previous post Don wrote...
Its all a matter of wording. Just cause YOU call it *reviewing* doesn't make it so. I know plenty of architects and engineers that have boilerplate sheets made up with stuff like standard details of headers, footing steel, sill sections, etc. that simply date and stamp them and sell them to the homeowner or others for a few hundred bux. The homeowner or builder includes them with the rest of the permit package and everyone's happy. When the code changed in 1992 requiring architects and/or engineers to stamp ALL plans submitted for permit this created a finacial boon for all of them. Architects and engineers design less than 5% of all the homes in SW FL but they make money off of ALL of them, by law. Now I think that is wrong! If a set of house plans meets the prescriptive requirements of IRC then no design professional should have to seal the drawings. That's they way it is here in Kitsap County and in most jurisdictions in Washington State. Of course in seismic zone D2, it's not very easy to design a house to meet the prescriptive requirements unless you happen to like houses with small rooms and not very many windows. -- Bob Morrison, PE, SE R L Morrison Engineering Co Structural & Civil Engineering Poulsbo WA bob at rlmorrisonengr dot com |
Reply |
Thread Tools | Search this Thread |
Display Modes | |
|
|
Similar Threads | ||||
Thread | Forum | |||
Mud bottom of drywall? | Home Repair | |||
how much drywall mud? | Home Repair | |||
Fiberglass mesh or paper tape for mud joints? | Home Repair | |||
? about paint and drywall mud | Home Repair |