  #1   Report Post  
Posted to alt.home.repair
Shawn
 
Posts: n/a
Default Central Air-Conditioner Installation Duct Questions

Hello,

I'm a newbie at home improvement, so please forgive my initial ignorance
when it comes to the technical terms.

I recently contracted with a nation wide vendor to install a central
air-conditioning unit in my ranch style home. This nation-wide vendor
sub-contacted with a local installer who performed the actual work during
May of 2004.

The blower was placed in the attic, with flexible duct work running to the
ceiling in various rooms. A large cold-air return was placed in the central
hallway ceiling.

During the first year I had several problems with the installation. (These
included the blower drain that didn't function properly (causing ceiling
damage) and the cooling ducts separating from the vents in the ceiling.
These were repaired quickly and without question.

Fast-forward to today. I switch the unit on and realized that the unit wasn't
cooling properly. I contacted the nation-wide vendor who dispatched a
heating and air specialist to my home. The specialist arrived and proceeded
to tell me that the duct work that was attached to the blower unit had
"collapsed in-on-itself;" specifically where the flexible duct work met the
intake end of the blower unit.

Apparently the original sub-contractor installer used semi-flexible foil
faced insulating sheeting to construct a connection from the flexible duct
work to the intake end of the blower. This same sub-contractor also created
a large box (for lack of a better term) of this same semi-flexible foil
faced insulating sheeting and attached it to the ducts with foil tape.

So, my question(s) is this:

Is it typical to connect flexible 6" or 8" ductwork to a blower type unit
with 1/2"foil-faced insulation sheeting? In other words, isn't there some
type of reducer or pre-fabricated part that performs this function?

Since I have one large central cold-air return, is there any pre-constructed
unit that should/could be installed in place of this taped amalgamation? My
current setup is a 3' by 3' box that is surface mounted to my ceiling with a
12" flex duct tube going from it to the cold-air intake of the blower.

Is there some type of building code that dictates what or how these type of
constructions should be constructed as? Obviously, each town/area has its
own regulations, but what should I look for when researching?

Thanks,

Shawn


  #2   Report Post  
Posted to alt.home.repair
John Grabowski
 
Posts: n/a
Default Central Air-Conditioner Installation Duct Questions


"Shawn" wrote in message
m...
Hello,

I'm a newbie at home improvement, so please forgive my initial ignorance
when it comes to the technical terms.

I recently contracted with a nation wide vendor to install a central
air-conditioning unit in my ranch style home. This nation-wide vendor
sub-contacted with a local installer who performed the actual work during
May of 2004.

The blower was placed in the attic, with flexible duct work running to the
ceiling in various rooms. A large cold-air return was placed in the

central
hallway ceiling.

During the first year I had several problems with the installation. (These
included the blower drain that didn't function properly (causing ceiling
damage) and the cooling ducts separating from the vents in the ceiling.
These were repaired quickly and without question.

Fast-forward to today. I switch the unit on and realized that the unit

wasn't
cooling properly. I contacted the nation-wide vendor who dispatched a
heating and air specialist to my home. The specialist arrived and

proceeded
to tell me that the duct work that was attached to the blower unit had
"collapsed in-on-itself;" specifically where the flexible duct work met

the
intake end of the blower unit.

Apparently the original sub-contractor installer used semi-flexible foil
faced insulating sheeting to construct a connection from the flexible duct
work to the intake end of the blower. This same sub-contractor also

created
a large box (for lack of a better term) of this same semi-flexible foil
faced insulating sheeting and attached it to the ducts with foil tape.

So, my question(s) is this:

Is it typical to connect flexible 6" or 8" ductwork to a blower type unit
with 1/2"foil-faced insulation sheeting? In other words, isn't there some
type of reducer or pre-fabricated part that performs this function?

Since I have one large central cold-air return, is there any

pre-constructed
unit that should/could be installed in place of this taped amalgamation?

My
current setup is a 3' by 3' box that is surface mounted to my ceiling with

a
12" flex duct tube going from it to the cold-air intake of the blower.

Is there some type of building code that dictates what or how these type

of
constructions should be constructed as? Obviously, each town/area has its
own regulations, but what should I look for when researching?

Thanks,

Shawn



I have seen boxes (Return plenum) made of that foil faced insulation board.
I never thought much of them, but the ones that I saw were functional. The
best way that I know of is to have a sheet metal fabricator make a box to
the specifications that you need. You should make a drawing with multiple
view points and all of the dimensions. Include any openings for duct
connections. You can also have a filter compartment built into it. Take it
to a sheet metal fabricator and they can give you an estimate as to the cost
to make it. You can buy duct wrap and insulate it yourself.

  #3   Report Post  
Posted to alt.home.repair
 
Posts: n/a
Default Central Air-Conditioner Installation Duct Questions

It sounds like a terrible install, but pictures would be helpful.

  #4   Report Post  
Posted to alt.home.repair
lp13-30
 
Posts: n/a
Default Central Air-Conditioner Installation Duct Questions

The material which you are talking about is known as "ductboard". The
other poster is correct in that insulated sheet metal is the best way to
go. Around here (San Antonio) sheet metal hasn't been used in
residential for over 30 years. It went from systems entirely of
ductboard starting in the late 60s, to ductboard boxes on the supply and
return hooked up with flex duct in the early 80s. Ductboard can be ok IF
done correctly, which yours must not have been. The company I work does
only replacement of equipment (no installations in houses that did not
already have central) We use ductboard to transition to the existing
ducwork as needed, and usually systems like yours if we replace existing
ductwork. I always use mastic sealer designed for the purpose, and seal
the iniside and outside of all the ductboard joints I do. Once it dries
and hardens, you couldn't get it apart if you wanted to. Bottom line:
try to get yours replaced with sheet metal, but if they will not do so,
insist that ductboard be done properly. If the "national company" you
are talking about is Sears, you have my sympathy. Stories like yours are
commonplace with them around here.

Reply
Thread Tools Search this Thread
Search this Thread:

Advanced Search
Display Modes

Posting Rules

Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
prog. therm. and heat pump questions Abby Normal Home Repair 119 December 22nd 05 12:38 PM
Questions on Central Vac [email protected] Home Repair 8 September 10th 05 03:48 PM
new furnace / duct work installation sx460 Home Repair 2 October 31st 04 11:48 PM
Sears For Central Air Conditioner KJ1 Home Repair 18 June 14th 04 05:26 AM
central heating installation (nottingham) Nick UK diy 1 March 3rd 04 11:39 AM


All times are GMT +1. The time now is 02:29 PM.

Powered by vBulletin® Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Copyright ©2004-2024 DIYbanter.
The comments are property of their posters.
 

About Us

"It's about DIY & home improvement"