View Single Post
  #1   Report Post  
Miki
 
Posts: n/a
Default Remodeling bathroom, which order to install things?

I have torn my bathroom down to the joists and subfloor. Which order
is SOP for installing tub, tile walls and tile floor?

I'd like to do the tile wall first, but something tells me that the tub
should go in prior so I can install the wall backerboard and tile so it
doesn't rest on the edge of the tub.
Any advice would be hugely appreciated.