View Single Post
  #1   Report Post  
Posted to alt.home.repair
Zootal[_7_] Zootal[_7_] is offline
external usenet poster
 
Posts: 106
Default Setting time for pvc glue versus "pressure testing" time

I'm gluing some water pipes in my basement using Flowguard Gold medium cpvc
cement. The instructions say "allow one hour cure before pressure testing".
Does that mean that after one hour I can just turn the water on and leave
it on? It gives no further instructions about drying time.