As per subject, what size is a 'bag' these days and the rough cost of a
'bag'?
Supplier worked out the job would need approximately 7 'bags' and
delivered 7. I've just looked and they are what I would call 'half
bags' 25Kg at around £3-80 per bag rather than the equivalent of 1cwt
or 50Kg.
Is 7 half bags enough for the 2 cubic metres of concrete I specified?
--
Regards,
Harry (M1BYT) (L)
http://www.ukradioamateur.co.uk