Fitting Gas pipes under the floor
wrote in message
oups.com...
I've got to run a 28mm copper pipe from the front to the back of my
house so I can install a Combi Boiler, It will have to lie under the
floor boards - is it O.K to lie it on the sleeper walls and betwean
the
joists (3"x2") - I mean has it got to be a certain distance below
the
floorboards? Any thing else I might need to know apart from getting
a
corgi fitter to do it?. Cheers. Martin
Call me old-fashioned, but I much prefer black iron barrel for gas,
particularly under floors. Won't get confused with any other services,
and will repell the stray nail pointed in it's direction in the
future.
AWEM
|